CHAPTER
4
Routine Implement Operation: Starting Jobs
25
CHAPTER 4
ROUTINE IMPLEMENT
OPERATION
STARTING JOBS
NOTE:
The ISO UT must be selected specifically for the implement before being used to operate the SC1/TC1
system. Refer to the UT operation manual for additional assistance with using your UT display.
Refer to the UT display or Raven field computer operation manual for assistance with setting up and
starting a job, setting guidance lines, and other guidance settings during in-field operations.
Make sure to properly configure the guidance width of the UT and/or Raven field computer for any changes to the
physical width of the plough before starting a job. Review the Raven field computer operation at
https://ravenindustries.mcoutput.com/fieldcomp/en-us/Content/Home.htm
OPERATOR LIABILITY
The Operator Liability Warning is displayed each time the SC1/TC1 system is powered on. If the operator does not
accept liability, the SC1/TC1 system will be disabled and cannot be reengaged until the liability warning is accepted.
FIGURE 1. Operator Liability Prompt
To proceed with normal operation of the SC1/TC1 GPS and auto-steering features, read and accept the Operator
Liability Warning.
Summary of Contents for SC1
Page 28: ...CHAPTER 3 24 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 36: ...CHAPTER 4 32 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 48: ...CHAPTER 5 44 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 54: ...CHAPTER 6 50 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 74: ...CHAPTER 8 70 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 76: ...Index 72 Raven SC1 TC1 Plough Steering Calibration and Operation Manual...