CHAPTER 8
64
Raven SC1™/TC1™ Calibration & Operation Manual for Towed Implements
FIGURE 7. Step Response Test Screen
2. Select the center up arrow. Wait for the actuator to reach the center position.
3. Select the left arrow.
4. Wait for the following fields to populate and record the data:
a. Step Size
b. Delay Time
c. Rise Time
d. Settling Time
e. Overshoot
5. Drive forward 1 - 4 mph with the engine RPM set at 3/4 throttle.
6. Select the center up arrow. Wait for the actuator to reach the center position.
7. Select the right arrow.
8. Wait for the following fields to populate and record the data:
a. Step Size
b. Delay Time
c. Rise Time
d. Settling Time
e. Overshoot
9. To test consistency, repeat step 1 through step 8.
NOTE:
Once the Step Response Test has been completed, the machine performance reading should fall
within the recommended system settings. Provide the collected data to a Raven Service Technician to
verify machine performance falls within the recommended settings.
Summary of Contents for SC1
Page 28: ...CHAPTER 3 24 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 36: ...CHAPTER 4 32 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 48: ...CHAPTER 5 44 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 54: ...CHAPTER 6 50 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 74: ...CHAPTER 8 70 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 76: ...Index 72 Raven SC1 TC1 Plough Steering Calibration and Operation Manual...