![background image](http://html1.mh-extra.com/html/raven/sc1/sc1_calibration-and-operation-manual_3868747015.webp)
Initial Implement Calibration: Initial Implement Calibration
11
INITIAL IMPLEMENT CALIBRATION
FIGURE 4. ECU Reset Required
NOTE:
The SC1/TC1 ECU is configured to steer tractors and sprayers from the factory. The ECU will need to
be reset for implement steering operations and restarted before the initial calibration wizard can be
completed. Complete the following steps to reset the ECU.
7. Touch the
Accept
button.
8. Allow the node to restart.
9. When the ECU restarts, select the
Implement Guidance and Steering
terminal from the UT menu.
10. After the ECU restarts, select the Type and Make from the Machine Selection Page.
11. Select the
Next
button.
GUIDANCE SETUP
1. Using the drop-down menu, select the desired guidance partner.
FIGURE 5. Guidance Setup Menu
NOTE:
For additional information on the Guidance Setup Menu, refer to “Guidance Setup Menu” on
page 43.
2. Select the
Accept
button to complete the guidance setup.
Summary of Contents for SC1
Page 28: ...CHAPTER 3 24 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 36: ...CHAPTER 4 32 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 48: ...CHAPTER 5 44 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 54: ...CHAPTER 6 50 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 74: ...CHAPTER 8 70 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 76: ...Index 72 Raven SC1 TC1 Plough Steering Calibration and Operation Manual...