Page 3
AP-2 Manual
Revision 7 - August, 2007
Chapter 1: Safety
Safety has been a prime consideration when designing the AutoPump System. Safety
guidelines are provided in this manual, and the AutoPump System safety features are listed
below. Please do not attempt to circumvent the safety features of this system.
We have also listed some possible hazards involved when applying this system to site
remediation. Nothing will protect you as much as understanding the system, the site at which
it is being used, and the careful handling of all the equipment and fluids. If you have any
questions, please contact the
QED
Service Department for guidance.
As you read through this manual, you will encounter three kinds of warnings. The following
examples indicate how they appear and lists their respective purposes.
Note
: Highlights information of interest.
Caution
: Highlights ways to avoid damaging equipment.
WARNING
: Highlights personal safety issues.
A Partial List of Safety Procedures
WARNING:
The air compressor and any other electrical equipment used with this
pneumatic system must be positioned outside of any area considered
hazardous because of possible combustible materials.
These safety procedures should be followed at all times when operating QED equipment on or
off site, and should be considered as warnings:
•
Wear safety goggles when working with the AutoPump System to protect eyes from any
splashing or pressure release.
•
Wear chemically resistant rubber gloves, boots, and coveralls when handling the AutoPump
and fluid discharge hose to avoid skin contact with the fluid being recovered..
Summary of Contents for AutoPump AP-2
Page 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Page 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Page 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Page 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Page 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Page 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Page 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Page 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Page 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Page 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...