QED Environmental Systems
AP-2 Manual
Page 8
• The AP-2 only uses air while pumping. Unlike systems that rely on bleeding air sensors or
timers which pressurize and depressurize the air hoses for each stroke, the air hose for the
AP-2 remains pressurized to the pumps at all times. Air compressor power consumption,
compressor filter maintenance, and thus operating costs are substantially reduced.
•
The AP-2 can be configured to fill from the top or the bottom.
Figure 2
on the next page illustrates an overview of an AutoPump System.
The AP-2 System provides everything required for pumping fluid from a well. QED can also
supply the air compressor, if desired.
The system is designed to perform for years and comes with a one year warranty.
Note:
An automatic drain on the compressor is highly recommended
since it
dramatically decreases air filter maintenance.
QED
can supply an automatic
drain.
Caution:
Alteration of the System: Do not change or modify the equipment without
the expressed written approval of
QED
.
Special Operating Conditions
Conditions may require adjustment or adaptations to the equipment. Below is a list of some of
these conditions, their possible effects, and solutions.
Since every site is different, please contact your QED representative for detailed assistance
if needed.
Cold Weather
Moisture in the pneumatic lines can freeze causing problems with the system. Such
freezing could result in regulators not reducing the air pressure, valves sticking, and
hoses clogging.
Actions To Take
• Use water traps and automatic compressor tank drains. These are available at
industrial distributing companies (e.g., W.W. Graingers®).
Summary of Contents for AutoPump AP-2
Page 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Page 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Page 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Page 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Page 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Page 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Page 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Page 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Page 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Page 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...