QED Environmental Systems
AP-2 Manual
Page 22
Chapter 4: Assembly & Installation
WARNING:
PVC pipe is generally not recommended for compressed air service.
Cautions
The following suggestions are offered to reduce the complications involved in assembly and
installation.
• Cover the hose ends with tape if they are being pulled through trenches. Be sure the ends
of the hoses that connect to the air compressor and fluid discharge have the correct fitting
leading out of the well. If you are unsure, look at the respective fittings on the pump.
• Blow out all water and particles from compressed air conduits (trunk lines, sensor hoses, air
supply hoses etc.) and fluid lines for at least 10 seconds after the water and particles exit
before connecting them to the system.
• When running hoses in conduit, include a rope to pull additional hoses in case they are
needed at a later date
• If solid metal piping is used for compressed air conduit, it is advised that an air filter or a
“Y” strainer with a fine mesh screen (80 mesh or finer) be placed at the downstream end
of the piping. Metal flakes, rust, galvanizing material, dirt, etc. can be dislodged from such
metal piping and travel to the pump.
Summary of Contents for AutoPump AP-2
Page 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Page 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Page 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Page 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Page 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Page 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Page 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Page 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Page 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Page 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...