QED Environmental Systems
AP-2 Manual
Page 90
Cleaning the Pump Cycle Counter
Sometimes the PCC does not count due to either the magnet shuttle or the spring hanging up
inside the magnet housing. The counter components can be cleaned by
gently
washing the
unit in warm water. A soft brush may be used to remove debris. To clean the inside, follow
these instructions:
(See Figure 36)
Note:
As a precaution, mark and/or measure with a pencil, the set distance
(See
Figure 36)
so that it can be reset in the same position should movement
occur. Do not loosen the thumb screw
(item #3)
since movement of the Display Assembly is unnecessary for
cleaning.
STEP 1 -
Remove the inlet fitting
(item #11)
, not the thumb screw
(item #3)
as noted above.
STEP 2 -
Remove the magnet shuttle assembly
(item #9)
and the spring
(item #8)
from inside the magnet housing
(item #6)
.
STEP 3 -
Inspect the magnet shuttle assembly
(item #9)
, the spring
(item #8)
,
and the inside of the magnet housing
(item #6)
for burrs which may
restrict the magnet shuttle assembly
(item #9)
movement.
STEP 4 -
If burrs are present, remove the burrs and smooth the part. Replace
the PCC if necessary.
STEP 5 -
Use a soft bottle brush and warm water to clean the inside of the magnet
housing.
Caution:
Be careful not to scratch the pieces.
STEP 6 -
Let the parts dry.
STEP 7 -
Reassemble the PCC.
Summary of Contents for AutoPump AP-2
Page 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Page 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Page 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Page 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Page 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Page 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Page 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Page 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Page 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Page 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...