Page 43
AP-2 Manual
Revision 7 - August, 2007
Chapter 6: Maintenance
AutoPump Service
AutoPump Shutdown and Removal from Well
To shut down and remove the AutoPump, follow these directions:
STEP 1 -
Wait until the pump is in its discharge cycle and then raise it above the
water level in the well. This will empty most of the fluid from the pump
making it lighter to lift. There will also be less fluid to drain from the
pump.
Note:
See Start Up and Operation for optional pump removal technique.
STEP 2 -
Pull the pump and hoses to the surface.
STEP 3 -
Shut off the air to the pump and disconnect the air hose from the pump.
STEP 4 -
Ensure that there is a safe place to drain any fluid from the pump and
discharge hose.
STEP 5 -
Disconnect the fluid discharge hose from the pump.
STEP 6 -
Drain the fluid by turning the pump upside-down and allowing fluid to
flow from the air inlet fitting.
Caution:
Wear gloves and catch the draining fluid in a sump or bucket.
Removing Pump Casing
Follow these instructions for removing the pump casing:
Caution:
When assembling or disassembling the pump, do not rotate the casing. If
the casing is turned and if any resistance is felt, stop. This action may cause
the float and control rod to rotate with the casing. Instead of rotating the
casing, spin the bottom check valve (or plug on a Top-Loading pump) and
hold the casing stationary.
Caution:
After troubleshooting is completed and before assembling the pump, slowly
move the float through its range to ensure that the lever trips, even if the
pump fills and empties slowly.
Summary of Contents for AutoPump AP-2
Page 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Page 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Page 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Page 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Page 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Page 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Page 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Page 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Page 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Page 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...