QED Environmental Systems
AP-2 Manual
Page 12
Chapter 3: Equipment
Unpacking
During the unpacking procedure, check for the following:
• All parts on the packing list have been included in the box
• All fitting openings are unobstructed
• The equipment has not been damaged in shipment
Equipment List
The equipment list will vary depending on site specifications, but the following list is a typical
configuration:.
1.
Top-Loading or Bottom-Loading AP-2 with support eyebolt
2.
Single stage filter/regulator with:
•
5 micron filter with manual drain (auto drain option)
•
Pressure regulator with gauge
3.
Pump Cycle Counter (PCC)
4.
Hoses:
•
Fluid discharge hose (black)
•
System air supply hose (blue)
•
AutoPump air hose (green)
•
Air exhaust hose (blue)
Note:
Black nylon tubing can be used in place of hose.
Summary of Contents for AutoPump AP-2
Page 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Page 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Page 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Page 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Page 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Page 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Page 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Page 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Page 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Page 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...