The “Gen 3” PW100 / 200 / 300 / 350 Reclaim unit frame is expanded to 19” deep and 48” wide and is shown 2” off
the equipment room wall. The PW400 frame is 24” deep and 60” wide.The required and optional stub up locations
and sizes are all shown in the drawings. It is highly suggested that two suction lines be included when designing and
installing the plumbing - one primary and one spare. It is also strongly suggested that the suction lines be pressure
tested and monitored during backfill of the trench.
Note:
The suction line size is 2” for a PW100 / 200 / 300 and is 3” for
a PW350 or PW400
Trench Flush & Chain Rinse Options are not available On the PW100 / 200 models
Equipment Footprint & Plumbing Stub-up Layout
PW100, 200, 300
Note 2” Suction Lines
PW350
Note 3” Suction Lines
Equipment
Footprint
Equipment
Footprint
Equipment
Footprint
PW400
Note 3” Suction Lines
& Larger Footprint
Summary of Contents for PURWATER RECLAIM 3.0
Page 2: ...Corporate 800 882 8854 2...
Page 4: ...Corporate 800 882 8854 4...
Page 6: ...Corporate 800 882 8854 6...