
Pronar ZKP800
FIRST ASSEMBLY MANUAL
A.2
A.1
PREPARATION
Due to its large overall dimensions, Pronar ZKP800 rotary rake is partially dismantled for
shipment and transport on a motor vehicle. Before the first start, the rotary rake has to be
assembled in order to be prepared for normal operation. It is absolutely necessary to
carefully read this manual before assembling the rotary rake. The persons who assemble the
rotary rake should have sufficient know-how, appropriate technology and qualifications for
this type of work.
The following parts of the rotary rake are disassembled before transport:
•
complete raking assemblies with chassis - 2 items,
•
tubular shields - 2 items,
•
brackets of tubular shields - 2 items,
•
raking arms - 22 items,
•
PTO shafts with overload safety clutch - 2 items,
•
forming shield - 1 item.
Warning boards with lights are turned by 180° and b olted to axle system bracket. Single
items and fasteners necessary for assembling the rotary rake are delivered in special bags.
After preliminary assembly, operation of the machine must be tested. All bolt and nut
connections must be checked and retightened after 50 hours of work.
ATTENTION!
Do NOT perform assembly work under raised and unsupported machine.
Exercise particular caution while assembling the machine. Make certain that all safety
conditions are adhered to.
During assembly work, the tractor and rotary rake must be protected against rolling.
Summary of Contents for ZKP800
Page 2: ......
Page 3: ...ROTARY RAKE PRONAR ZKP800 MACHINE IDENTIFICATION TYPE ZKP800 SERIAL NUMBER ...
Page 7: ......
Page 8: ......
Page 12: ......
Page 13: ...SECTION 1 BASIC INFORMATION ...
Page 24: ...Pronar ZKP800 SECTION 1 1 12 ...
Page 25: ...SECTION 2 SAFETY ADVICE ...
Page 38: ...Pronar ZKP800 SECTION 2 2 14 FIG 2 2 Locations of information and warning decals ...
Page 39: ...SECTION 3 DESIGN AND OPERATION ...
Page 49: ...SECTION 4 CORRECT USE ...
Page 69: ...SECTION 5 MAINTENANCE ...
Page 85: ...SECTION 5 Pronar ZKP800 5 17 FIG 5 5 Rotary rake lubrication points ...
Page 86: ...Pronar ZKP800 SECTION 5 5 18 FIG 5 6 Rotary rake lubrication points ...
Page 93: ...NOTES ...
Page 94: ... ...
Page 95: ...ANNEX A FIRST ASSEMBLY MANUAL ...