
Pronar ZKP800
SECTION 5
5.8
FIG. 5.3
Sequence of nut tightening
(1) - (6) sequence of nut tightening, (L) spanner length, (F) user weight
Checking wheel half axle tightening:
•
after first use,
•
after first day of work,
•
at regular intervals (50 h).
The inspection should be repeated individually if a wheel has been removed from the
wheel axle.
ATTENTION
Axle nuts may not be tightened with impact wrench, because of danger of exceeding
permissible tightening torque, the consequence of which may be breaking the thread
connection or breaking off the hub pins.
The greatest precision is achieved using a torque spanner. Before commencing work,
ensure that correct tightening torque value is set.
Summary of Contents for ZKP800
Page 2: ......
Page 3: ...ROTARY RAKE PRONAR ZKP800 MACHINE IDENTIFICATION TYPE ZKP800 SERIAL NUMBER ...
Page 7: ......
Page 8: ......
Page 12: ......
Page 13: ...SECTION 1 BASIC INFORMATION ...
Page 24: ...Pronar ZKP800 SECTION 1 1 12 ...
Page 25: ...SECTION 2 SAFETY ADVICE ...
Page 38: ...Pronar ZKP800 SECTION 2 2 14 FIG 2 2 Locations of information and warning decals ...
Page 39: ...SECTION 3 DESIGN AND OPERATION ...
Page 49: ...SECTION 4 CORRECT USE ...
Page 69: ...SECTION 5 MAINTENANCE ...
Page 85: ...SECTION 5 Pronar ZKP800 5 17 FIG 5 5 Rotary rake lubrication points ...
Page 86: ...Pronar ZKP800 SECTION 5 5 18 FIG 5 6 Rotary rake lubrication points ...
Page 93: ...NOTES ...
Page 94: ... ...
Page 95: ...ANNEX A FIRST ASSEMBLY MANUAL ...