Pronar ZKP800
FIRST ASSEMBLY MANUAL
A.6
In order to ensure synchronous operation of PTO shafts, connect them to the central
transmission shafts so that articulated joints of shafts are located in one plane, symmetrically
with regard to the central transmission – figure (A.5).
FIG. A.5
Proper arrangement of PTO shafts
(1) central transmission, (2) articulated joint of shaft
ATTENTION
Overload safety clutch of PTO shaft must be located on the raking assembly transmission
side.
When connecting PTO shafts, make certain that the ends of PTO shaft hitch are securely
snapped.
DANGER
Articulated joints of shafts on the central transmission side should be positioned in one
plane (symmetrically with regard to the transmission). Incorrectly positioned shafts may
get damaged while the raking assemblies are being lifted.
After connecting the PTO shaft, the rubber shield on the overload safety clutch side should
be secured with a jubilee clip (3) – figure (A.4).
Repeat the procedure for the second raking assembly.
Summary of Contents for ZKP800
Page 2: ......
Page 3: ...ROTARY RAKE PRONAR ZKP800 MACHINE IDENTIFICATION TYPE ZKP800 SERIAL NUMBER ...
Page 7: ......
Page 8: ......
Page 12: ......
Page 13: ...SECTION 1 BASIC INFORMATION ...
Page 24: ...Pronar ZKP800 SECTION 1 1 12 ...
Page 25: ...SECTION 2 SAFETY ADVICE ...
Page 38: ...Pronar ZKP800 SECTION 2 2 14 FIG 2 2 Locations of information and warning decals ...
Page 39: ...SECTION 3 DESIGN AND OPERATION ...
Page 49: ...SECTION 4 CORRECT USE ...
Page 69: ...SECTION 5 MAINTENANCE ...
Page 85: ...SECTION 5 Pronar ZKP800 5 17 FIG 5 5 Rotary rake lubrication points ...
Page 86: ...Pronar ZKP800 SECTION 5 5 18 FIG 5 6 Rotary rake lubrication points ...
Page 93: ...NOTES ...
Page 94: ... ...
Page 95: ...ANNEX A FIRST ASSEMBLY MANUAL ...