I
I
I
I
I
I
I
I
I
I
I
I
t h e C a s t e r
t h e C h a n n e l
When the ends of the assembly are flush with the outer ends of the channel, tilt
the assembly upward to rest against the top of the channel. You may have to
adjust the position of the assembly
to slide it over the four studs
protruding into the channel (see Figure 9).
the
Assembly to me
Cab/net
6. Place one lockwasher on each stud, then screw one nut onto each stud.
lighten the nuts securely: torque to 25
(19.4
Repeat steps 3 through 5 for the other caster assembly.
To lower the cabinet,
the leveling feet. (See page 14 for instructions on
how to use a hex wrench to raise the leveling feet.) Raise each leveling foot in
turn until it is flush
the base of the cabinet The casters now support the
cabinet.
Roll the UPS cabinet carefully to the
location
where it will be installed.
1 6
Plus UPS
Manual
Summary of Contents for Plus 80
Page 1: ...0 Powerware Plus 80 Unintemqtibk Power Supply Operation 164200252 Rev A...
Page 55: ...a 1 a Pe WNP U N I N T E R R U P T I B L E P O W E R S Y S T E M S I i b I EXlDE ELECTRONICS...
Page 88: ...I I I I I I IO I I I I b I I NOTES 10 Powemam Plus 60 UPS ln stallation Manual...
Page 147: ...2 I FRONT Powerware Plus 80 UPS installation Manual A 13...
Page 153: ...5 61 CRE47Eo By L ORLANDO RMWON A ONE B 269r Powemare Plus 90 UPS lnstailation Manual A 19...