18.
The output of the UPS is a separately derived source. Output neutral is bonded
to equipment ground through the main bonding jumper. Refer to NEC article
250 and local codes for proper grounding practices.
External overcurrent protection is not provided by this product, but is required
by codes. Refer to Table L on page A-2 for wiring requirements. If an output
lockable disconnect is required, it is to be supplied by others.
When an input transformer is present, the rectifier and bypass inputs may both
be supplied by the same source.
The distribution panel in the PDM has
poles.
The PDM cabinet is bottom entry only
23.
Terminals El through El5 are UL and CSA rated at SO’C. A hex key tool is
required to attach wires to terminals. Refer to Table for power cable
terminations. Drawing
on page A-l 1 shows the location of
these power cable terminals inside the UPS cabinet.
Table R. Power Cable Terminations
,
I
Internal
El
I 1
M C M
31.1
to U P S
Phase
1
#6-350 MCM
31.1 (275)
1
31.1
E3
(275)
A C
El3
2
MCM
42.4 (375)
NOTES
L
A - 6
Plus 60 UPS
Manual
Summary of Contents for Plus 80
Page 1: ...0 Powerware Plus 80 Unintemqtibk Power Supply Operation 164200252 Rev A...
Page 55: ...a 1 a Pe WNP U N I N T E R R U P T I B L E P O W E R S Y S T E M S I i b I EXlDE ELECTRONICS...
Page 88: ...I I I I I I IO I I I I b I I NOTES 10 Powemam Plus 60 UPS ln stallation Manual...
Page 147: ...2 I FRONT Powerware Plus 80 UPS installation Manual A 13...
Page 153: ...5 61 CRE47Eo By L ORLANDO RMWON A ONE B 269r Powemare Plus 90 UPS lnstailation Manual A 19...