Each cabinet of your UPS system is shipped on a separate pallet. Use a
forklift or pallet jack to move the packaged cabinets to the installation site, or as
close as possible to the site, before you unload them from the pallets.
This is the basic sequence of the installation steps:
1. Prepare your site (described in this chapter).
2. Inspect, unpack, and unload the UPS cabinets (Chapter 4).
3. Attach the caster assemblies, as
needed
(Chapter 4).
4. Join the cabinets together using supplied hardware (Chapter 5).
5. Wire the cabinets together (Chapters
10, as applicable).
6. Install features, accessories, and/or options (Chapters
10. as
applicable).
7. Complete the Installation Checklist on page 9.
8.
Authorized service personnel perform preliminary checks and
startup.
After wiring the UPS system to the facility power and critical load(s), be sure to
ground the system according to local and/or national
wiring codes, using
your own cabling and conduit
Install batteries in accordance with all applicable
and regulations, including
the National Electrical Code (NEC). Article 480.
Startup and operational checks should be
by
authorized
service personnel. This service is usually offered as
of the
contract for your UPS system.
Plus UPS Installation Manual
5
Summary of Contents for Plus 80
Page 1: ...0 Powerware Plus 80 Unintemqtibk Power Supply Operation 164200252 Rev A...
Page 55: ...a 1 a Pe WNP U N I N T E R R U P T I B L E P O W E R S Y S T E M S I i b I EXlDE ELECTRONICS...
Page 88: ...I I I I I I IO I I I I b I I NOTES 10 Powemam Plus 60 UPS ln stallation Manual...
Page 147: ...2 I FRONT Powerware Plus 80 UPS installation Manual A 13...
Page 153: ...5 61 CRE47Eo By L ORLANDO RMWON A ONE B 269r Powemare Plus 90 UPS lnstailation Manual A 19...