I
I
I
I
I
I
I
I
I
I
I
I
7. Remove the nut from the screw in the lower door hinge of the UPS
8.
Hold the angled bracket parallel to the floor (see Figure 15). The flange with the
hole in it (labeled A in the
should be facing upward. The flange with the
tab (labeled in the figure) should be pointing toward the slot in the base of the
optional cabinet.
(see Figure 15 on page 24)
L o w e r -
door hinge
A n g l e d
Insert the tab
into the slot in the base of the optional cabinet
Slide the bracket toward the UPS cabinet while slipping the hole (A) onto the
screw in the lower door hinge of the UPS cabinet
11.
Replace the nut (removed in step 7 on page 24) on the hinge screw to secure
the angled bracket in place.
Repeat steps 2 through 11 to join another optional cabinet to the other side of
the UPS cabinet.
Attach a ground bus to the joined cabinets using the procedure on page 26.
24
UPS
Manual
Summary of Contents for Plus 80
Page 1: ...0 Powerware Plus 80 Unintemqtibk Power Supply Operation 164200252 Rev A...
Page 55: ...a 1 a Pe WNP U N I N T E R R U P T I B L E P O W E R S Y S T E M S I i b I EXlDE ELECTRONICS...
Page 88: ...I I I I I I IO I I I I b I I NOTES 10 Powemam Plus 60 UPS ln stallation Manual...
Page 147: ...2 I FRONT Powerware Plus 80 UPS installation Manual A 13...
Page 153: ...5 61 CRE47Eo By L ORLANDO RMWON A ONE B 269r Powemare Plus 90 UPS lnstailation Manual A 19...