Safety instructions for pump relocation
Maintenance must be performed by a skilled maintenance operator
trained in the relevant health and safety aspects (EMC, electrical hazards,
chemical pollution, etc.).
Isolate the product from all energy sources (mains electricity, compressed
air, etc.) before starting work.
Electric shock hazard on touching.
When the main isolator is switched to the «0» position, items located
between the mains connection and the isolator are still under mains
voltage.
Disconnect the mains cable from all power sources before commencing
any maintenance work on the product.
Other located hazardous energies.
Water cooling circuit and nitrogen purge are pressurized hazardous
energies.
Release pressure before servicing:
for the N2 purge, disconnect the gas line quick connector and turn off
the pressure regulator by turning the knob counter-clockwise;
for the water cooling circuit, disconnect the input connector and
leave the output connected. Wait 1 minute before disconnecting the
output.
–
–
Electric shock hazard.
Some components have capacitors charged to over 60VDC. When power
is switched off, they keep their charge for a time. Residual voltages
from the filter capacitors can cause electric shocks all the way back to
the mains plug. Wait 5 minutes after power-off before commencing any
work on the appliance.
Users are advised to observe the precautions presented below during
any maintenance operation on the pump and, more especially, any
operations requiring the disassembly of sub-assemblies.