System Maintenance
4
-4
0993-5255
Maintenance checklist
Maintenance checklists for the spectrometer system are presented below.
Maintenance checklists for the burner system are presented in the
Burner System
User’s Guide
and for the graphite furnace, cooling system, and the furnace
autosampler in the
Graphite Furnace User’s Guide.
General preventative maintenance procedures
Instrument
and work area
For safety reasons, and to avoid contaminating new samples, you should
make sure that the instrument and the work area are always absolutely clean.
This is especially important when you are working with toxic substances and
when you are measuring trace amounts of any elements.
Wipe up spills immediately before they can cause further contamination or
damage.
Before you leave the instrument standing idle for any period of time, make
sure that all the components are clean.
Fume
ventilation
Make sure that the main fume ventilation system functions correctly. Always
switch it on when you are using the instrument.
Environmen-
tal conditions
Make sure that the environmental conditions are as described in
Acetylene
cylinder
Always change to a new acetylene cylinder when the cylinder pressure falls
to below 600 kPa (6 bar; 87 psig) (
Spectrometer, maintenance checklist
External
surfaces
Wipe over the surfaces with a lint-free cloth moistened with a dilute solution
of laboratory detergent.
The surfaces are resistant to dilute acids and alkalis, and to a lesser extent to
strong acids and alkalis and organic solvents.
Air filters
Fit new filters yearly or more often in a dusty environment
(
Atomizer
compartment
windows,
lamp end
windows
These windows do not normally require cleaning but if they become marked,
e.g., with fingerprints, you can clean them (
Summary of Contents for AAnalyst 700
Page 2: ......
Page 3: ...ATOMIC SPECTROMETRY AAnalyst 700 Atomic Absorption Spectrometer User s Guide...
Page 8: ...Contents C 4 0993 5255...
Page 10: ...1 2 0993 5255...
Page 44: ...Safety Regulatory Information 1 36 0993 5255...
Page 46: ...Spectrometer Installation 2 2 0993 5255...
Page 68: ...Spectrometer Installation 2 24 0993 5255...
Page 70: ...Preparing the System 3 2 0993 5255...
Page 84: ...System Maintenance 4 2 0993 5255...
Page 98: ...Parts and Supplies 5 2 0993 5255...
Page 102: ...Laboratory Requirements 6 2 0993 5255...
Page 120: ...Spectrometer System Description 7 2 0993 5255...
Page 136: ...Translations of Warnings 8 2 0993 5255...
Page 146: ...Translations of Warnings 8 12 0993 5255...
Page 185: ...0993 5255 In 1 Index...
Page 186: ...Index In 2 0993 5255...
Page 192: ......
Page 193: ......