Spectrometer Installation
2
-22
0993-5255
Electrical connections
Read the following instructions very carefully before connecting any cables.
See
Chapter 6, Laboratory Requirements
for the specification of the line power
supply.
Summary
1. Make sure that the spectrometer and the cooling system (where applicable)
are switched off.
2. Switch the circuit breaker on the rear panel of the spectrometer to the off
position (marked ).
3. Switch off the computer and all other instruments that you will connect to the
spectrometer or computer. See the guides for the individual instruments for
the procedure to use.
4. Disconnect the line power cords of the spectrometer and all other instruments
from the line power supply.
5. Connect the instrument control cables and power cords as shown on the
following page.
6. When you have completed all connections, switch on the system (
‘Switching on the system’, page 3-3
W2.3
Warning: Electrical Hazard
To prevent potential injury to yourself and damage to the instrument, switch
OFF all instruments in the system and disconnect them from the line power
supply before you perform the procedures described below.
Summary of Contents for AAnalyst 700
Page 2: ......
Page 3: ...ATOMIC SPECTROMETRY AAnalyst 700 Atomic Absorption Spectrometer User s Guide...
Page 8: ...Contents C 4 0993 5255...
Page 10: ...1 2 0993 5255...
Page 44: ...Safety Regulatory Information 1 36 0993 5255...
Page 46: ...Spectrometer Installation 2 2 0993 5255...
Page 68: ...Spectrometer Installation 2 24 0993 5255...
Page 70: ...Preparing the System 3 2 0993 5255...
Page 84: ...System Maintenance 4 2 0993 5255...
Page 98: ...Parts and Supplies 5 2 0993 5255...
Page 102: ...Laboratory Requirements 6 2 0993 5255...
Page 120: ...Spectrometer System Description 7 2 0993 5255...
Page 136: ...Translations of Warnings 8 2 0993 5255...
Page 146: ...Translations of Warnings 8 12 0993 5255...
Page 185: ...0993 5255 In 1 Index...
Page 186: ...Index In 2 0993 5255...
Page 192: ......
Page 193: ......