![Panduit Smartzone PViQ Connectivity System User Manual Download Page 112](http://html1.mh-extra.com/html/panduit/smartzone-pviq-connectivity-system/smartzone-pviq-connectivity-system_user-manual_3458906112.webp)
PVIQ™ CONNECTIVITY SYSTEM USER MANUAL V 1.0
111
Figure 89: PM IU when MAC Remove is Complete
Fiber I-Cord Guided Patching
This section describes the process for adding a connection via a guided MAC.
1. From the SmartZone Asset and Connectivity Software Modules Connectivity
window, drag (or cut and paste) a fiber switch port to a location opposite the
desired connection patch port.
2. Select the connection cell, located between the two fiber switch port cells. Right-
click the connection cell and select PViQ™ I-Cord from the drop-down list. Click
Save
to implement the change.
The SmartZone Asset and Connectivity Software Modules send a MAC add
interconnect command to the PViQ™ Fiber Patch Panel, designating a PViQ™ I-
Cord, and including the appropriate far-end information. The designated port LED
flashes green.
Figure 90: Target Port during a Guided Add
3. Plug in the near-end of the I-Cord to the designated port. The LED turns off.
Figure 91: Designated Port after Add is Complete