background image

Operating Instructions

Up/Down Wall Mount Kit

Up/Down Stand Kit

(For elite Panaboard)

Model No.

UE-608030
UE-608031
UE-608032

Installation Manual Included (for qualified service personnel)

To assemble this unit, please refer to the Installation Manual on pages 14 through 39.

Before operating this unit, please read these instructions completely and keep them carefully for future 
reference.

This unit is designed for installation by a qualified servicing dealer.
Installation performed by non-authorized individuals could cause safety-related problems with the operation of 
this equipment.

For U.S.A. only:

To locate the closest authorized dealer in your area, please call 1-800-449-8989.

UE-608030_EN.book  1 ページ  2010年10月28日 木曜日 午後4時20分

Summary of Contents for UE-608030

Page 1: ...on Manual on pages 14 through 39 Before operating this unit please read these instructions completely and keep them carefully for future reference This unit is designed for installation by a qualified servicing dealer Installation performed by non authorized individuals could cause safety related problems with the operation of this equipment For U S A only To locate the closest authorized dealer i...

Page 2: ...r use so that the screen surface will be less likely to be in the shadows making the elite Panaboard easy to use When using up down stand kit the large sized casters provided enable the projector arm part to rotate so that even a large board and stand system can be easily moved from one place to another Things you should keep a record of Exemption of Liability Panasonic System Networks Co Ltd is n...

Page 3: ...ion 16 Packing Configuration 16 Included Accessories 16 Wall Mounting Construction 18 Checking the Wall 18 Wall Types and Installation Procedures 20 Mounting and Securing the Up Down Unit 24 Preparing to Mount the Projector 24 Mounting the Projector Arm 26 Adjusting the Up Down Unit 28 Mounting the elite Panaboard 33 Checking the Up Down Operations 33 Wiring Connections 34 Apply the High Temperatu...

Page 4: ...tors to a specific operating procedure that must not be performed This symbol is used to alert operators to a specific operating procedure that must be emphasized in order to operate the unit safely These symbols are used to alert operators to a specific operating procedure that must be performed carefully WARNING CAUTION Have the unit installed removed and disposed of only by qualified service pe...

Page 5: ...tems are to be placed on the table plate put them toward the rear of the board Otherwise they may be sandwiched between the table plate and elite Panaboard while the board is moving up or down and this may damage the system Do not allow children to play near the elite Panaboard stand on it or crawl under it Children may become sandwiched between the elite Panaboard and the table plate when the boa...

Page 6: ...6 Operating Instructions For Your Safety Warning Label 1 2 3 4 5 6 3 4 5 6 6 1 2 5 Side View Side View ...

Page 7: ... UB T880W 4 Safety Brake This can be applied to ensure that the elite Panaboard will not move up or down 5 Pin End Stoppers These are put into place at some point along the up down moving range to ensure that the projector will not suddenly drop down to a lower position Before lowering the projector to its lowest position and with the pin end stoppers pushed in lower the up down frame 6 Foot Reinf...

Page 8: ...g the Equipment on the Table Plate There are limits on the dimensions of the equipment which can be placed on the table plate so check them out Stand Part Front 1 150 mm 3 ft 9 9 32 in Stand Part Side 110 mm 4 11 32 in 350 mm 1 ft 1 25 32 in Notebook Computer ...

Page 9: ...t point 1 670 mm 5 ft 5 3 4 in Usually the elite Panaboard is used at a height between the highest point and the point at which it is stopped by the pin end stopper Note The preceding height is the height of the elite Panaboard unit Not including the height of the projector arm The screen of models UB T880 and UB T880W serves as a touch sensor Avoid touching the screen surface when raising or lowe...

Page 10: ...itting your head or other parts of your body Similarly the up down part on which the elite Panaboard is installed will also move down to a low position so exercise care when tall equipment has been placed on the table plate Be careful to avoid pinching your finger in the pin end stopper hole Using the elite Panaboard 1 Turn on the power of the computer and projector 2 When an image has appeared on...

Page 11: ...tached at the position shown in the figure and secure the projector arm Note The position of knob A varies depending on the projector used 4 Lower the elite Panaboard to the lowest point Note If the height of the entrance is less than 2 m 6 ft 6 3 4 in proceed with steps 1 and 2 and after having moved the projector lower the height of the projector arm by following the steps below 1 Attach knob B ...

Page 12: ...utlet Make sure that none of the cables are dragged along with the stand Be absolutely sure to have another person ready to help you move the stand Take care that none of the equipment placed on the table plate will fall off While moving the stand the stowed projector will move out of your field of view so while moving the stand take care not to allow the projector to bump into a wall door or othe...

Page 13: ...ls extremely heavy when it is raised Something may be wrong with the up down unit Stop using the elite Panaboard immediately and contact your dealer Even when the elite Panaboard is raised it drops down under its own weight The adjustment part for raising and lowering the elite Panaboard may be out of position Contact your dealer and ask for a service engineer to conduct the adjustments again ...

Page 14: ... Denotes a potential hazard that could result in serious injury or death Denotes hazards that could result in minor injury or damage to the unit These symbols are used to alert operators to a specific operating procedure that must not be performed This symbol is used to alert operators to a specific operating procedure that must be emphasized in order to operate the unit safely This symbol is used...

Page 15: ...plates until you are ready to attach the board and projector If these plates are removed by mistake the up down part may spring up and cause injury Lock the casters when using the stand both after installation has been completed and after the stand has been moved If the stand is used with the casters unlocked it may move or be overturned and or cause injury After completing the installation or mov...

Page 16: ... are present and accounted for Up Down Unit UE 608030 Up Down Stand Kit Up Down Unit UE 608030 Stand Table Unit UE 608031 Short Throw Arm Unit UE 608032 Up Down Wall Mount Kit Up Down Unit UE 608030 Short Throw Arm Unit UE 608032 No Part Name Illustration Q ty No Part Name Illustration Q ty 1 Cable Holder A 1 5 Board Mounting Screw M6 4 2 Cable Holder B 2 6 Board Bracket Fastening Screw M5 6 3 Hoo...

Page 17: ...32 in for Securing Table Plate 4 No Part Name Illustration Q ty No Part Name Illustration Q ty A Spacer for Securing Projector 5 G Pipe Cap 1 B Bushing for Securing Projector 5 H Screw M4 x 8 mm 5 16 in for Securing Pipe Cap 1 C Screw M4 x 30 mm 1 3 16 in for Securing Projector 5 I Screw M3 x 25 mm 31 32 in for Securing Projector for Acer 3 D Screw M4 x 10 mm 13 32 in for Securing Projector Sub Br...

Page 18: ...r individual 2 person crew Before proceeding with the work check that there are no other individuals around you To ensure that the work is accomplished safely and properly make it a basic rule to strictly observe all other applicable aspects of safety control If there is a chance that the unit has ended up being deformed or damaged by unexpected impact while it was being transported and installed ...

Page 19: ...ors Principal Structural Component This term refers to walls pillars floors beams roofs and staircases and it excludes partition walls stud walls attached columns raised floors floors on the bottom most levels of buildings floors of revolving stages secondary beams pent roofs partial sub staircases outdoor staircases and other structural parts of a similar nature which are not crucial to the build...

Page 20: ...ely 4 mm 5 32 in from the surface of the wall 4 With the help of another individual take the up down unit out of its packing box and hang it on the wall by engaging the elongated holes at the top of the pipe on the rear surface of the unit with the two bolts 5 With the up down unit hanging on the wall mark off the positions of the holes used to secure the bottom part of the unit put the up down un...

Page 21: ...proceed with installation after having reinforced the wall so that it does meet the conditions For the wall backing materials use wood materials measuring at least 50 mm 75 mm 1 31 32 in 2 15 16 in equivalent to the ones given in the table below or metal stands or other such parts with at least the equivalent strength The maximum distance between the wall backing materials must be 910 mm 2 ft 11 1...

Page 22: ...ing material side and tighten the bolts securely Prohibited Action Do NOT do the following work Do not provide reinforcement where the wall backing materials and reinforcing material are not interconnected Otherwise there is a danger that the unit will fall off the wall Precautions for Tightening Nuts Recommended tightening torque of M8 nuts 12 5 N m 127 kgf cm For tightening purposes use a torque...

Page 23: ... the inside wall Install the anchors all the way through to the principal structural component as above For details on installing the anchors refer to I When the Wall is a Principal Structural Component a concrete wall which is at least 120 mm 4 3 4 in thick page 20 Ensure that the installation strength is at least as great as the specified pull out strength of the anchors which is 5 197 5 N 530 k...

Page 24: ...ght pipes and fasten the up down unit securely to the wall After mounting the up down unit on the wall pull the unit toward you and check that the wall mounting bolts are fastened completely Notice To ensure safety do this work with another individual without fail Preparing to Mount the Projector Shown below are the projector models which can be secured to the projector bracket Use the spacers bus...

Page 25: ...ough the holes to be used for the projector model concerned on the projector bracket in such a way that the bracket is sandwiched between the spacers and bushings The spacers A used to secure the projector are secured in the holes whose positions are indicated by the initial of the projector brand 2 Align the attached spacers with the holes used to suspend the bottom panel of the projector and sec...

Page 26: ...at the plugs to connect to the projector come out at the longer end of the projector arm the part where the projector is mounted If the outlet end of the power cable is too large to go through the projector arm the projector arm cannot be mounted on the up down unit Pass a length of string twine through the projector arm and then pass the cable with the string attached to it through the projector ...

Page 27: ...rojector bracket on which the projector unit has been mounted onto the projector arm The position where the projector is to be mounted depends on the model which is going to be used Adjust the distance from the longer end of the projector arm the part where the projector is mounted to the projector bracket to what is indicated below and secure the projector 5 Tighten up the screw F for securing th...

Page 28: ...ement of the elite Panaboard and other equipment Use the hook and loop fastener 3 for cable management of the computer on the table and cords connected to the plug adaptor Adjusting the Up Down Unit Align the position of the hold tube assembly to which the gas spring is secured with the elite Panaboard model to be installed and set it Adjustment Tolerance d1 Pipe Cap G Screw for Securing Pipe Cap ...

Page 29: ...he elite Panaboard using screws 6 for securing each board bracket Attach the lower left bracket to the left side outer side of the left board attachment Similarly attach the lower right bracket to the left side inner side of the right board attachment With the help of another individual take hold of the elite Panaboard align it so that the board bottom bracket and the part for securing the elite P...

Page 30: ...own unit secure the elite Panaboard at the highest position The up down locking plates are secured using screws When removing them remove the screws After mounting the plates the other way round tighten the screws again to secure them Lift the elite Panaboard to the highest point and secure it with the safety brake Notice At this stage compensation for board weight is not possible and if a UB T880...

Page 31: ...oosen nut A counterclockwise and then move the nut about 1 mm 1 16 in 1 8 Holding nut B in place with a 10 mm 13 32 in wrench use another wrench to turn the M6 189 screw clockwise and then move nut B about 1 mm 1 16 in 2 9 Holding nut B in place with a 10 mm 13 32 in wrench use another wrench to turn nut A clockwise and then tighten nuts A and B 3 M6 189 Screw Nut A Nut B side side side Clockwise ...

Page 32: ...nversely when the hold tube assembly is moved toward the side of the arm 450 the load which can be supported by the arm assembly is reduced When the UB T781 UB T781W UB T780 or UB T780BP is installed 11 Holding nut B in place with a 10 mm 13 32 in wrench use another wrench to loosen nut A counterclockwise 5 12 Holding nut B in place with a 10 mm 13 32 in wrench use another wrench to turn the M6 18...

Page 33: ...the up down unit Confirm that the elite Panaboard is securely attached and does not move freely back and forth Checking the Up Down Operations Confirm that the up down part can easily be lifted higher than the pin end stopper Confirm that the up down part does not drop more than 20 cm 7 7 8 in of its own accord when released from the highest point At this stage check up down operations and if they...

Page 34: ...to the power outlet Apply the High Temperature Warning Label 1 Turn on the power of the computer projector and elite Panaboard in this order 2 Apply the high temperature warning label to the projector sub bracket When projector vents face the right or left side the projector sub bracket may become hot On the bracket by projector vents apply the high temperature warning label K as shown in the figu...

Page 35: ...cted images Adjusting the Left and Right Positions of the Images Projected on the elite Panaboard After the height of the projected image has been adjusted check the left and right positions of the image which is projected on the screen If the projected image markedly overlaps the frame on the right or the ultrasonic sensor on the left return to Mounting the elite Panaboard page 33 and adjust the ...

Page 36: ...t and secure the elite Panaboard position 2 Mount the lower frame cover of the elite Panaboard onto the center bottom part Checking the Operations of the elite Panaboard For details of cleaning the screen and checking the operations of the elite Panaboard refer to the Operating Instructions of the elite Panaboard Two wing Bolts Lower Frame Cover ...

Page 37: ...and collars which have been removed are not used Loosely secure the left stand and right stand to the up down unit using the bolts 8 for securing the left and right stands provided the flat washers and spring washers which were removed and the collars 9 for securing the left and right stands Notice Mount the stands with the sides provided with the locking casters pointed upward 2 Tighten bolts A U...

Page 38: ...hen tighten up the bolts again 6 Secure the table plate between the left and right stands Tip the table as you insert it between both sides of the stand Align the table with the position of the bolt holes and then tighten the bolts Notice Securely tighten the bolts 8 for securing the left and right stands using a force of 5 2 N m d 0 5 N m 53 kgf cm d 5 kgf cm 7 Attach the foot reinforcing assembl...

Page 39: ...er through the flat washers for securing the protective cover Then use the screws to secure the cover Securing the Up Down Stand Kit When using the system with the up down stand kit the system may fall over if a child should hang or swing from the projector arm for example After deciding where the system will be used to prevent tipping drive the anchors into the floor and secure the rear foot rein...

Page 40: ... Panasonic System Networks Co Ltd 2010 PJQXC0341YA F F0710MH2110 Türkiye deki kullanıcılar için EEE Yönetmeliğine Uygundur For users in Turkey EEE Complies with Directive of Turkey ...

Reviews: