MECH-54
5-21. A/C head Replacement
& Adjustment
<Tools required>
Nut Driver (5.5mm : VFK1150)
Hex Driver (VFK1148)
Hex
Wrench
(VFK1190)
Point:
Memorize height of the Nut (C) before remove
the Nut (C).
(Removal)
1. Loosen the hex screw (B) and remove the Nut (C).
Detach the Head Height Adjustment Spring and
then remove the A/C Head Unit as shown in
Figure 5-21-1.
Figure 5-21-1
2. Remove the 2 screws (A) and disconnect the
P4001
on the
RF/CUE P.C.B.
and
P30
on the
MECH I/F
, and then remove the A/C Head from
the A/C Head Plate as shown in Figure 5-21-2.
Figure 5-21-2
3. Remove the Shield Cover by removing 2 screws
(D) in Figure 5-21-1.
4. Unsolder the lead wires as shown in Figure
5-21-3. (When unsoldering the lead wires, do not
unsolder all at the same time)
(Installation)
1. Remove the Shield Case from the New A/C Head
and solder the lead wires to New A/C Head.
(Refer to Figure 5-21-3)
2. Reinstall the shield case to A/C Head.
3. Install the A/C Head to A/C Head Plate by
tightening 2 screws (A), then set the gap parallel
between A/C Head and A/C Head Plate.
4. Install the A/C Head Unit.
5. Attach the Head Height Adjustment Spring and
tighten the Nut (C).
6. Clean the surface of the A/C Head.
Figure 5-21-3
A/C Head
Cable Color
Connector
1 Pink
Yellow
2 White
3 Pink
Red P4001
4 White
5 Pink
Green
6 White
7 White
Yellow P30
8 Black
Summary of Contents for AJ-D93MC
Page 3: ... 3 ...
Page 4: ... 4 AJ D93MC ...
Page 5: ... 5 ...
Page 6: ... 6 AJ YA93P AJ YA94G ...
Page 8: ... 8 AJ SD93P E ...
Page 9: ... 9 ...
Page 10: ... 10 ...
Page 11: ... 11 AJ YA93P AJ YA94G ...
Page 12: ...FCD0409NTKK145E466E467 ...
Page 65: ...INF 52 14 ERROR MESSAGES ...
Page 66: ...INF 53 ...
Page 67: ...INF 54 ...
Page 68: ...INF 55 ...
Page 110: ...MECH 32 Figure 3 35 2 Confirm this value ...