MECH-60
(Adjustment)
1. Place the reels in the L size position.
2. Push the iron core of M-Stopper Solenoid by
hand.
3. Observe the clearance (A) between Mech.
Chassis and M-Stopper as shown in Figure 5-27-2.
And make sure that it is within 1.1 to 1.3mm.
4. If not, loosen the 2 screws (A), which fixed
M-Stopper Solenoid. And adjust the position of
M-Stopper Solenoid so that the clearance (A) is
within the specification. And tighten the 2 screws
(A).
Figure 5-27-2
6-1. Mech. I/F P.C. Board
5-28. T4 Post Position Adjustment
1. Confirm that the hole (B) of T4 connection Gear
match with the hole of T4 post as shown in figure
5-28-1.
2. Confirm that the portion (C) of T4 connection Gear
and hole (A). Those are located as shown in figure
5-28-1.
3. If not, adjust the phase of T4 post.
Note:
This confirmation should be performed on
unloading condition.
Figure 5-28-1
Figure 6-1-1
P15
P25 P26
P12
P16
P36
P11 P48
P21
6. CONNECTOR LOCATION
Summary of Contents for AJ-D93MC
Page 3: ... 3 ...
Page 4: ... 4 AJ D93MC ...
Page 5: ... 5 ...
Page 6: ... 6 AJ YA93P AJ YA94G ...
Page 8: ... 8 AJ SD93P E ...
Page 9: ... 9 ...
Page 10: ... 10 ...
Page 11: ... 11 AJ YA93P AJ YA94G ...
Page 12: ...FCD0409NTKK145E466E467 ...
Page 65: ...INF 52 14 ERROR MESSAGES ...
Page 66: ...INF 53 ...
Page 67: ...INF 54 ...
Page 68: ...INF 55 ...
Page 110: ...MECH 32 Figure 3 35 2 Confirm this value ...