6 |
Page SVC 820 Tankless Gas Trouble Shooting Manual
6
YES
NO
Health
Check
82 – Program Chip
79 – Blower Motor
71 – Gas Control Valve
76 – Remote Control
14 – OHL
Open Hot Water Tap
Up &
Down
Buttons
24: Activated > 20 Seconds
Thermistors
Check
Blower
Speed
Flue
Blockage
Detect
Flame
False
Flame
1-2
Ignition
Attempt
31 – Inlet Thermistor
33 – Outlet Thermistor
32 – HE Thermistor
34 – Ambient Thermistor
61
90: > 12 seconds
72: > 5 seconds
11: > 2 Ignition Attempts
Igniter Rod Off
Gas Control Valve & Igniter Rod On
Blower On
Next Page
1 – Ignition Sequence
SEQUENCE OF OPERATIONS:
1. Ignition Sequence
2. Monitoring Sequence
3. Shutdown Sequence
Plug In
Summary of Contents for PH2-20R DVSN
Page 158: ... 158 Schematic Disassembly PH2 20RDVS PH2 25RDVS PH2 28RDVS ...
Page 159: ... 159 Schematic Disassembly PH2 20RDVS PH2 25RDVS PH2 28RDVS ...
Page 160: ... 160 Schematic Disassembly PH2 20RDVS PH2 25RDVS PH2 28RDVS ...
Page 162: ... 162 Schematic Disassembly PH2 20ROF PH2 25ROF PH2 28ROF ...
Page 163: ... 163 Schematic Disassembly PH2 20ROF PH2 25ROF PH2 28ROF ...
Page 164: ... 164 Schematic Disassembly PH2 20ROF PH2 25ROF PH2 28ROF ...
Page 166: ...Schematic Disassembly PHH 32RDV PHH 25RDV 166 ...
Page 167: ...Schematic Disassembly PHH 32RDV PHH 25RDV 167 ...
Page 169: ... 169 Schematic Disassembly PHH 32ROF PHH 25ROF ...