Note:
The floor will be flipped over and floor
runners will sit on your foundation. It is
important to note that having a level
foundation is critical. Choosing a foundation will
vary between regions. Typical foundations can
be concrete pads or patio stones positioned
underneath the floor runners.
9.
With Floor Runners attached, carefully flip the
floor over and place on your foundation.
Caution-
you will need 2 people to assist you. Be
careful when laying floor down not to bend or twist
floor. When in place, level floor completely.
Concrete Slab
Foundation
Foundations
8.
Complete all Floor Runners.
Alternate Runners
10.
Position
Plywood Floor
pieces (8) on top
of completed floor joists. Plywood will sit flush
with outside of floor joist frame.
Hint:
Use a chalk line
to mark location of
floor joists to
determine screw
placement.
Front
11.
With Plywood positioned correctly on floor
framing, attach with 1 1/4” screws. Use screws
every 16”.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 5