background image

Assembly of 12x8 Bison Workshop

 

 

Hammer

 

Step ladder

 

Sand paper

 

Battery-powered drill/screwdriver

 

8mm drill

 

Pencil

 

Tape measure

 

Gloves

 

Sharp knife and saw

         

IMPORTANT! 

PLEASE READ PRIOR TO ASSEMBLY OF 
THE BUILDING 

EVERY PRECAUTION IS TAKEN TO 
ENSURE THAT YOUR BUILDING HAS NO 
ELEMENT INCORRECTLY PLACED OR 
POSSIBLY HAZARDOUS, HOWEVER 
PRIOR TO USE PLEASE CHECK ALL 
SURFACES FOR THE FOLLOWING: 
1 RAISED GRAIN, SPLINTERS: sand 
down timber to smooth finish 
2 NAIL/SCREW/PIN HEADS PROUD: tap 
home to be flush with surface of timber 
3 DAMAGED SCREW HEADS 
RESULTING IN SHARP SPLINTERS OF 
METAL: replace 
4 SHARP ENDS OF NAILS/ SCREWS/ 
PINS PROTRUDING THROUGH THE 
PANEL: remove and reposition. 
5 ENSURE ALL PARTS ARE SECURED 
AGAINST REASONABLE FORCE: 
remove and refit 
6 ENSURE THERE ARE NO LOOSE 
PARTS: remove and refit/discard 

We recommend that protective 
gloves be worn throughout

 

Wood is a natural product and is therefore 
prone to changes in appearance, including 
some warping, movement and splitting, 
particularly during unusual climatic conditions 
(long hot or wet spells of weather). As a natural 
occurrence this is not covered by a guarantee. 

     

PLEASE NOTE

 

14/
03/
11 

   

TOOLS REQUIRED 

QTY    DESCRIPTION 

8      Panes of glazing 457x373 
16      Beading 464mm 
16      Beading 377mm 
6     Cover strips 18

7

5mm 

4     Fascia 14

2

0mm 

2      Diamonds 
66      80mm screws 
40      40mm nails 
148    Felt nails 

64     15mm panel pins 
3      Felt roll 4mtr x 1mtr 
1      Double truss 

1795

1795

1858

ROOF PANEL - QTY 4

1851

1874

1874

1851

1795

BACK PANEL - 2 SECTIONS

2250

PLAIN PANEL

1795

FRONT PANEL - 2 SECTIONS

2250

DOOR PANEL

1330

1790

FLOOR PANEL - QTY 2

2390

Parts List 

Thank you and congratulations on the purchase of your Shire garden building. 
We believe that this product will give you many years of excellent service. This 
is a natural product manufactured to a high standard therefore if you have any 
queries  or  experience  any  difficulties  then  please  contact  our  customer  service 
hotline  on

  01945  465  295

.  Normal  office  hours:  8.30  am  to  5.00  pm  Monday  to 

Friday.  

 

Preparation of base 

We recommend that the base onto which your building will stand should be at least 
75mm larger in each direction than the total floor size of the building. 
Actual floor area of the building: 3590x2390 (12’x8’) 
Total height clearance: 2270mm 
The chosen position in your garden for the siting of the building should be  
excavated to a depth of 75mm to allow a base of sand, on to which paving slabs 
can be evenly laid - 

THEY MUST BE LEVEL AND FIRM.

 

Treatment/care of your Garden Building 

Treat with a suitable decorative wood finish immediately. We recommend that all 
timber pieces be treated again prior to assembly and again within 3 months of  
assembly. We further recommend that all pieces are treated again at least annually 
or as frequently as the instructions on the product used recommends. 
We would suggest that all wall panels be treated in an upside-down position to 
allow the finish/treatment to ingress into the tongue and groove jointing. 
We would also remind you that you would rarely (if ever) be able to re-treat the 
underside of the floor following assembly. We strongly recommend that the under-
side of the floor is treated an absolute minimum of twice (not including pre-
treatment). 

Garden buildings are not waterproof, therefore on assembling building we 
recommend using a silicon based sealant between wall panels and wall  
panels and floor. 

EXTERNAL VIEW 
OF PANELS 

Reviews: