Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 28
69.
Place 3rd Ridge Cap 8” back from 2nd. (enough to cover shingle nails).
Attach 3rd Ridge Cap down as per
Step 68
. Continue to position and attach
Ridge Caps until half roof is complete. From opposite side, position and attach
Ridge Caps as described above. Score/cut 1 Ridge Cap to 12” or to fit in the
center of roof. Attach center cap with 4 - 1 1/2” Shingle Nails.
8”
8”
3/4” screws
Attach Black Tee
Hinges with 3/4” &
2” Black hardware
provided
Note,
illustration of Hinge may not be
accurate. The # of screw holes in the hinge may
vary from three to four depending on model.
71.
Next, position and secure the Double Doors. Starting with
Right Side Door
, position so there is a
1/2” gap on bottom and approximately 3/8” on the side. Use a spare Shingle to shim door in place at the
bottom. Using 2” black screws, secure hinges to Door Trim. Hint: Do not attach all the 2” screws until
both doors are positioned correctly into place. Use Screw Driver to tighten screws completely.
Bottom of Door
1/2” gap
at bottom.
3/8” on
side.
2” Black Screws
70.
Attach Door Hinges to both
left
and
Right Side Double Doors
. Position Hinges equally on
door trim as shown above and attach with Black 3/4” & 2” screws.
2” screws