6.
Attach
Floor Runners
to completed floor
frame. There are 3 floor runners per 182” side and
5 completed runners in total. Use 3 - 2.5” screws
per Runner. Use 2 - 68.25” and 1 - 45.5” per side.
96”
4.
Complete all large and small frame attachments. Screw
each completed section together with 8 - 2.5” screws.
5.
When completed, your floor footprint
should be 182” deep x 96”wide.
182”
7.
Make sure Runners are flush with outside and
front and rear floor framing but not overhanging.
2.
Lay out
Floor Joist Frames
as
illustrated at left. There are 4 larger and
4 smaller Frame Sections. The Footprint
for the floor when attached together will
be 182” deep x 96” wide.
3.
Attach each large and small floor joist frames
together with 6 - 2.5” screws per section.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 4