18.
Start positioning and securing wall panels around your floor. Attach wall studs together as
per
Step 15.
19.
Complete all wide wall attachments. At the front of the shed, side walls will sit flush
with front of floor framing and plywood.
Front of
Shed
Wall panel
will sit flush
with plywood
at front of
shed.
Note:
Illustration
shows Window
Panel with side
configuration.
Window Panel
position is
arbitrary.
17.
Locate
Window Insert
. Place Window Insert into wall opening tight to wall siding.
On the inside, shim Window Insert evenly in cavity. Kits include one additional shingle for shimming
of the window. When properly positioned, secure Window Insert to wall framing cavity with 4 - 2”
screws.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9