Roof Batten flush
with rafter end.
49.
Place Roof Panel so it sits flush on 3rd rafter from the outside (doubled up rafter). Lowest batten on
roof should be flush with end of rafter at bottom. From the outside, screw down through bottom row of
shingles into rafter with 1 - 2 1/2” screw.
50.
Locate 2 Mid Roof Panels (roof battens flush to with shingles) and Front Outside Roof Panel
(shingles overhang battens). Place on rafters and align panels as per
Step 49.
Screw Mid Panels
down to rafters with 2 - 2 1/2” screws in the bottom row of shingles. Attach Front as per
Step 49.
51.
Position and attach remaining Roof Panels as per
Steps 49-50.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 21