background image

!

24/7 Support

help.backyardproducts.com

Business Hours

(734) 242-6900

Answers to frequently 

asked questions

Monday - Friday ........... 8:00am - 6:00pm EST

Saturday - Sunday .................................Closed

Technical assistance and 

how-to videos
Submit a help request
Request replacement parts

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

vis

i

t b

a

cky

ard

in

st

a

l

l

er.

co

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

ca

n

 th

f

 owc

o

de 

t

a

p

ply 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

STOP

DO NOT RETURN

   

TO THE STORE!

If you discover missing or damaged parts,

or if you have questions about the building process,

please reach out to us directly for the fastest service.

16903

Summary of Contents for MODERN 8' x 6'

Page 1: ... shed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 STOP DO NOT RETURN TO THE STORE If you discover missing or damaged parts or if you have questions about the b...

Page 2: ... This page intentionally left blank ...

Page 3: ...omer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 10 CHECK ALL PARTS Inventory all parts listed on pages 4 7 ADDITIONAL MATERIALS You will need additional materials to complete your shed See page 3 for required and...

Page 4: ...nstallation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk Gun Hammer Leve...

Page 5: ...elow is a list of additional materials not included x3 2 x 4 x 8 5 x 10 x 243 8 cm Treated Lumber Cut to 2 x 4 x 93 5 x 10 x 236 2 cm Standard 24 61 cm spacing Optional 12 30 5 cm spacing REINFORCED WOOD FLOOR FRAME OPTIONAL COMPLETING YOUR SHED You will need these additional materials PAINT FOR SIDING 2 Gallons Use 100 acrylic latex exterior paint 2 coats recommended CAULK 3 Tubes Use acrylic lat...

Page 6: ...x 243 8 cm x1 x2 2 x 3 x 27 11 16 5 1 x 7 6 x 60 2 cm LOA x1 2 x 3 x 51 7 8 5 1 x 7 6 x 131 8 cm QXA x8 2 x 3 x 45 1 4 5 1 x 7 6 x 114 9 cm ND x2 2 x 3 x 69 7 8 5 1 x 7 6 x 177 5 cm ONB x2 2 x 3 x 69 5 1 x 7 6 x 175 3 cm OV x1 2 x 3 x 96 5 1 x 7 6 x 243 8 cm PT x4 2 x 4 x 96 3 4 5 1 x 10 2 x 245 7 cm UXA x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TREATED 2 x 3 x 22 5 8 5 1 x 7 6 x 22 9 cm x2 TNB x2 WFS 2...

Page 7: ... 32 7 16 x 72 1 0 x 82 4 x 182 9 cm 3 8 x 48 x 72 1 0 x 121 9 x 182 9 cm 3 8 x 23 9 16 x 48 1 0 x 59 8 x 121 9 cm 3 8 x 48 x 96 1 0 x 121 9 x 243 8 cm 3 8 x 4 7 8 x 28 1 2 1 0 x 12 4 x 72 4 cm 3 8 x 4 7 8 x 72 1 0 x 12 4 x 182 9 cm 3 8 x 4 7 8 x 80 7 8 1 0 x 12 4 x 205 4 cm 3 8 x 4 7 8 x 80 7 8 1 0 x 12 4 x 205 4 cm 3 8 x 1 3 4 x 68 1 0 x 4 4 x 172 7 cm 3 8 x 1 3 4 x 68 3 16 1 0 x 4 4 x 173 2 cm 3...

Page 8: ... 8 1 0 x 3 8 x 60 6 cm 3 8 x 1 1 2 x 76 1 0 x 3 8 x 193 cm 3 8 x 1 1 2 x 54 9 16 1 0 x 3 8 x 138 6 cm 3 8 x 3 1 2 x 10 3 4 1 0 x 8 9 x 27 3 cm 3 8 x 3 1 2 x 55 9 16 1 0 x 8 9 x 141 1 cm 3 8 x 3 1 2 x 55 9 16 1 0 x 8 9 x 141 1 cm 10 1 2 x 20 3 4 26 7 x 52 7 cm 3 8 x 3 1 2 x 18 5 8 1 0 x 8 9 x 47 3 cm 3 8 x 1 1 2 x 73 5 16 1 0 x 3 8 x 192 4 cm SOFFIT TRIM x2 1 1 2 3 8 cm 3 4 1 9 cm x8 OO 69 Door Sti...

Page 9: ... 9 cm 2 5 0 cm x235 1 1 2 3 8 cm NOTE If you are using a nail gun nails may be used where screws are shown for quicker assembly Length of nail must match screw length 8 x 3 4 1 9 cm x12 1 2 5 cm ROOF PANELS 26 x 82 1 2 66 x 209 6 cm x5 3 7 6 cm 2 5 1 cm x2 Foam Strip BAG of 5 26 66 cm x130 2 5 1 cm ...

Page 10: ...your kit on a concrete slab refer to the diagram below A treated 2 x 4 5 1 x 10 2 cm sill plate is required when installing your shed on concrete Hint Purchase full length treated lumber Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requir...

Page 11: ...lls B 15 Roof Framing C 30 34 Front Overhang D 32 Soffit E 35 Fascia F 36 Corner Trim G 37 47 Doors H 38 Roof Panels I 48 Rake Flashing J 54 A J B B B B C G G I H F D E Description Section Page COMPONENT SECTION INDEX ...

Page 12: ...mum between leveling material locations 48 12 2x4 Treated Lumber 2 Block Level 12 Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Runners are generally 12 30 5 cm from ends of floor frame and under seams FLOOR FRAME NOT INCLUDED OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame Our recom...

Page 13: ...2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm PARTS REQUIRED Center on marks FLOOR FRAME Look for Stamp TREATED HINT For easier nailing stand on frame 1 Arrange parts as shown on flat surface Measure and mark Secure with 2 3 nails at each mark BEGIN Your floor frame is now complete FINISH Flush Flush Flush Flush 3 7 6 cm Nails ...

Page 14: ...will be approximately 120 304 8 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square After the floor frame is level and square fasten the frame to the 4x4 runners at each point wher...

Page 15: ...QUIRED x1 x1 x95 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm 2 5 1 cm Flush FLOOR PANELS 3 4 1 9 cm 3 4 1 9 cm Fig B Flush Flush Flush Install the 48 x 96 panel with the 48 edge and corner flush to the floor frame Fig A Ensure 3 4 measurement on the frame Secure panel with 2 2 nails in the corners Install the 23 7 8 x 96 panel flush to installed panel and flush to the floor frame Secure panel with 1 2 na...

Page 16: ...k that the floor frame is level after installing floor panels Re level if needed The floor should be used as a level work surface for wall construction Organize your wall sections during sub assembly to avoid over handling of the walls HINT IMPORTANT ...

Page 17: ...lush ND to OV and along edges of panel Ensure lip edge of panel is on OV Secure panel to 2x3 parts with 1 1 2 nails spaced 6 apart along edges and 12 apart in panel center ND ND ND OV 2 Repeat steps to build the 2nd side wall Flush 1 1 2 3 8 cm x72 3 7 6 cm x4 x6 2 x 3 x 45 1 4 5 1 x 7 6 x 114 9 cm ND x2 2 x 3 x 69 5 1 x 7 6 x 175 3 cm OV 34 1 2 87 6 cm 34 1 2 87 6 cm CENTER 48 x 72 LIP EDGE x2 48...

Page 18: ...measurement on PT 1 1 4 Flush panel to ends of PT Ensure lip edge of panel is on PT Check measurement to center of each ND 31 Secure panel to 2x3 parts with 1 1 2 nails spaced 6 apart along edges and 12 apart in panel center ND TNB TNB ND LOWER WALL ASSEMBLY UPPER WALL ASSEMBLY PT 2 3 Flush Flush Flush 48 x 96 LIP EDGE 6 15 2 cm 12 30 5 cm FINISH Your lower and upper back wall sub assemblies are n...

Page 19: ...ile angle of TPC is correct and ensure there is a 3 8 measurement at each end of TPC Secure with 2 3 screws at an angle Predrill all holes IXB x3 TPC WFS WFS LOA LOA 3 7 6 cm x14 3 7 6 cm Screws TPC Fig A 3 8 1 0 cm Angled edge All parts on flat x2 2 x 3 x 27 11 16 5 1 x 7 6 x 60 2 cm LOA x2 WFS 2 x 3 x 22 1 16 5 1 x 7 6 x 56 cm x3 2 x 3 x 4 1 16 5 1 x 7 6 x 10 3 cm IXB x2 2 x 4 x 93 5 1 x 10 2 x ...

Page 20: ...ion shown Predrill all holes for 3 screws with 1 8 bit Ensure the 30 3 16 measurement to WFS 3 7 6 cm x7 FRONT WALL FRAME PREASSEMBLY PARTS REQUIRED 2 3 4 Your front wall frame is now assembled FINISH 3 7 6 cm x4 x1 2 x 3 x 51 7 8 5 1 x 7 6 x 131 8 cm QXA x2 2 x 3 x 69 7 8 5 1 x 7 6 x 177 5 cm ONB QXA ONB ONB 3 7 6 cm Nails Flush Flush On 1 1 2 edge TPC Fig A Angled edge WFS WFS 3 7 6 cm Screws 30...

Page 21: ...o installed panels and flush to the door frame Maintain the 48 7 8 measurement in the door opening Secure panels with 2 nails into door frame and with 1 1 2 nails into all other 2x3 frame parts Space nails 6 apart along edges Your front wall is now assembled FINISH Flush Flush Flush Flush Flush Flush Flush Flush Flush 6 15 2 cm 48 7 8 124 1 cm Do not nail in grooves 6 15 2 cm 1 1 2 3 8 cm x42 1 1 ...

Page 22: ...5 1 cm Nails 2 5 1 cm Screws Secure lower edge of wall panels to floor with 2 nails spaced 6 apart Angle nails into floor frame 2 Center left wall on the 72 side of floor Secure wall panel to floor frame with 2 2 screws BEGIN 1 2 5 1 cm x2 D O O R 6 15 2 cm ...

Page 23: ...21 PARTS REQUIRED 3 7 6 cm x4 LEFT WALL INSTALLATION 3 7 6 cm Screws 3 Secure wall studs to floor with 3 screws Predrill holes with 1 8 bit Your left wall is now installed FINISH ...

Page 24: ...1 BACK WALL INSTALLATION 3 7 6 cm x1 PARTS REQUIRED Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame 2 Secure back wall panel to left wall stud with 1 1 2 nails spaced 6 apart 3 Flush Flush 2 5 1 cm x1 2 5 1 cm Screw 2 5 1 cm Nails 6 15 2 cm 1 1 2 3 8 cm Nails 6 15 2 cm 2 5 1 cm x17 1 1 2 3 8 cm x9 Do not nail in grooves ...

Page 25: ...x5 PARTS REQUIRED Your back wall is now installed FINISH 4 Working inside secure left wall stud to back wall framing with 1 3 screw at an angle Fig B Secure wall studs with 3 screws angled into floor Predrill all holes with 1 8 bit Fig B 3 7 6 cm Screw ...

Page 26: ...stud with 1 2 screw Ensure corners are flush Predrill hole with 1 8 bit Flush Flush 2 5 1 cm Screw 2 5 1 cm x13 2 5 1 cm x1 Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame 2 Secure back wall panel to right wall stud with 1 1 2 nails spaced 6 apart 3 Do not nail in grooves 1 1 2 3 8 cm Nails 6 15 2 cm 1 1 2 3 8 cm x9 ...

Page 27: ...N Your right wall is now installed FINISH 3 7 6 cm Screws 4 Working inside secure right wall stud to back wall framing with 1 3 screw at an angle Fig B Secure wall studs with 3 screws angled into floor Predrill all holes with 1 8 bit Fig B 3 7 6 cm Screw ...

Page 28: ... edge of panels to floor frame with 2 nails spaced 6 apart Angle nails into floor framing 2 Center front wall on the floor Secure bottom of front wall panels to side wall studs with 2 2 screws 2 5 1 cm x2 2 5 1 cm Screw 2 5 1 cm Screw 2 5 1 cm x10 2 5 1 cm Nails 2 5 1 cm Nails 6 15 2 cm ...

Page 29: ... 1 1 2 3 8 cm x18 Secure front wall panels to side wall studs with 1 1 2 nails spaced 6 apart 3 4 Working inside secure side wall studs to front wall framing with 1 3 screw at an angle Fig B Predrill all holes with 1 8 bit Secure wall studs with 3 screws angled into floor 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screws ...

Page 30: ...CK WALL INSTALLATION PARTS REQUIRED Center pre assembled upper back wall on the lower back wall Secure lower edge of upper back wall panel to lower back wall frame with 1 1 2 nails spaced 6 apart 1 1 2 3 8 cm x17 Pre assembled x1 6 15 2 cm 1 1 2 3 8 cm Nails ...

Page 31: ...el to side wall framing with 1 1 2 nails spaced 6 apart BEGIN 1 UPPER SIDE WALL PANELS PARTS REQUIRED 2 5 1 cm x18 1 1 2 3 8 cm x26 x1 x1 Flush Flush Flush Flush Flush panel corners Install wall panels with the primed side facing out 2 5 1 cm Nails 2 5 1 cm Nails 6 15 2 cm 1 1 2 3 8 cm Nails 6 15 2 cm Your upper side wall panels are now installed FINISH ...

Page 32: ...A Secure TPC to vertical framing with 2 3 screws Predrill holes with 1 8 bit BEGIN 1 ROOF OVERHANG FRAMING PARTS REQUIRED 1 1 2 3 8 cm Nails 3 7 6 cm x2 1 1 2 3 8 cm x7 x1 2 x 4 x 93 5 1 x 10 2 x 236 2 cm TPC Tapered Profile Working inside secure TPC with 1 1 2 nails spaced evenly 2 Flush Flush Flush Flush TPC Fig A Tapered Profile ...

Page 33: ... front and back tapered purlins with 3 screws Predrill holes with 1 8 bit BEGIN 1 ROOF OVERHANG FRAMING PARTS REQUIRED 3 7 6 cm x8 1 1 2 3 8 cm x14 Working inside secure RPY with 1 1 2 nails positioned as shown 2 x2 2 x 4 x 80 11 16 5 1 x 10 2 x 204 9cm RPY Fig A RPY RPY 3 7 6 cm Screws 1 1 2 3 8 cm Nails ...

Page 34: ...RED 3 7 6 cm x6 x1 2 x 4 x 96 3 4 5 1 x 10 2 x 245 7 cm UXA Flush BEGIN 1 Arrange parts as shown Measure and mark Secure 3 AFD to UXA with 2 3 screws Predrill holes with 1 8 bit UXA AFD x3 FINISH Your front overhang unit is now assembled x3 2 x 4 x 4 7 16 5 1 x 10 2 x 11 3 cm AFD ...

Page 35: ...h 2 3 screws at each end Predrill holes with 1 8 bit Working inside secure overhang blocks to upper front wall framing Flush block to wall panel Secure each block with 2 3 screws Predrill holes with 1 8 bit FINISH Your overhang framing is now installed 2 Pre assembled Flush Flush Flush Flush Flush 3 7 6 cm Screws 3 7 6 cm Screws ...

Page 36: ...support purlins UXA into side wall panel notches Flush purlins to side overhang framing Secure with 2 3 screws at each end Predrill holes with 1 8 bit FINISH Your roof purlins are now installed Flush Flush x3 2 x 4 x 96 3 4 5 1 x 10 2 x 245 7 cm UXA 3 7 6 cm Screws ...

Page 37: ...ls as shown Install 2 1 1 2 x 73 5 16 side soffit panels both sides flush to installed front soffit panels and flush to side wall panels Secure with 2 finishing nails spaced evenly 2 3 BEGIN 1 Flush to front wall Flush to back wall Flush to side wall 2 Finishing Nails 5 13 16 x 75 3 4 1 1 2 x 76 1 1 2 x 73 5 16 Install soffit panels with the primed side facing down Flush Flush Flush Flush x1 3 8 x...

Page 38: ... of back roof overhang framing Secure with 2 finishing nails spaced evenly 2 3 2 Finishing Nails 2 Finishing Nails 4 7 8 x 80 7 8 Left 4 7 8 x 80 7 8 Right Flush Flush Flush Flush 2 5 1 cm Finishing Nails Flush to wall panels Flush to overhang frame FASCIA TRIM PARTS REQUIRED BEGIN 1 Install trim with the primed side facing out Your fascia trim boards are now installed FINISH x52 2 5 1 cm x2 3 8 x...

Page 39: ... installed corner trim Secure with 2 finishing nails spaced evenly 1 3 4 x 79 9 16 1 3 4 x 68 3 16 1 3 4 x 68 3 16 1 3 4 x 79 9 16 Flush to panel Flush to panel Flush to panel Flush to panel Flush to panel Flush to panel Flush to panel Flush to panel Install trim with the primed side facing out FRONT BACK WALL TRIM PARTS REQUIRED x26 2 5 1 cm 2 5 1 cm Finishing Nails 2 5 1 cm Finishing Nails Flush...

Page 40: ... 3 2 cm Screws 3 8 1 cm 3 8 1 0 cm RED Bottom edges Flush GREEN 3 8 1 cm OFFSET OFFSET 3 8 1 cm Arrange parts as shown on flat surface Ensure that the 3 8 offset is to top Look for red right and green left on hinge board Attach temporary supports OO and IFA as shown BEGIN 1 x1 3 8 x 3 1 2 x 10 3 4 1 0 x 8 9 x 27 3 cm IFA ...

Page 41: ...ling your doors Secure hinge boards to door studs with 10 3 screws Install OO and 1 3 8 x 1 3 4 trim piece flush under wall panels Secure OO to floor frame with 2 3 screws Fig A 3 7 6 cm x12 OO x1 OO and 3 8 x 1 3 4 Temporary Supports SEAM 3 8 1 cm Fig B Temporary Support Temporary Support 69 175 3 cm Door Stiffener x1 3 8 x 1 3 4 x 68 3 16 1 0 x 4 4 x 173 2 cm 3 8 x 1 3 4 trim 5 3 7 6 cm screws i...

Page 42: ...measurement between rails Secure with 3 4 screws from inside of doors Fig B Reinforce the door trim with 3 4 screws through door panel into trim Fig A Locate screws evenly spaced as shown Fig B BEGIN RIC x8 IFA JSA 3 4 1 9 cm Screws 3 4 1 9 cm Screws x1 3 8 x 3 1 2 x 10 3 4 1 0 x 8 9 x 27 3 cm IFA Flush 10 3 4 27 3 cm 10 3 4 27 3 cm 10 3 4 27 3 cm 10 3 4 27 3 cm x8 3 8 x 3 1 2 x 18 5 8 1 0 x 8 9 x...

Page 43: ... Locate screws evenly spaced as shown Fig B RIC x2 AIB AIB AIC AIC 3 4 1 9 cm screws from behind Door Trim Hinge Board Fig A Door Panel 3 4 1 9 cm Screws 3 4 1 9 cm Screws DOOR TRIM PARTS REQUIRED BEGIN 1 2 Install door trim AIC and AIB as shown Secure with 3 4 screws from inside of doors x2 3 8 x 3 1 2 x 18 5 8 1 0 x 8 9 x 47 3 cm RIC Flush x1 3 8 x 3 1 2 x 55 9 16 1 0 x 8 9 x 141 1 cm AIB x1 3 8...

Page 44: ... framing x1 3 8 x 1 1 2 x 54 9 16 1 0 x 3 8 x 138 6 cm JSA x1 48 Metal Threshold 3 4 1 9 cm x9 Bagged separately special coating CENTER 2 5 1 Finishing Nails JSA 9 Special Coating Screws Your over door trim and threshold are now installed FINISH Center metal threshold between doors and secure with 9 3 4 special coating screws into floor Flush ...

Page 45: ... grade caulk behind frame near edge before installing to seal window 3 4 1 9 cm Screws x8 Your transom windows are installed FINISH 3 4 1 9 cm x8 x2 BACK SIDE OF DOORS Center window on mark FRONT SIDE VIEW Transom Window Install window from the back side of the door Center the window looking at the front of the door make sure there is an even reveal along the trim of the door and the window Use 3 ...

Page 46: ...nter OO in door opening OO x2 OO x2 5 8 1 6 cm 5 8 1 6 cm OFFSET 2 5 1 cm Screws Fig B IT IS IMPORTANT TO HOLD THESE DIMENSIONS 2 5 1 cm Screws x14 FINISH BEGIN 1 Center 2 door stiffeners OO vertically on each door as shown Fig A Fig B Secure with 7 2 screws through outside trim into OO Fig B 69 175 3 cm Door Stiffener ...

Page 47: ...handle is now installed FINISH Pre drill 1 4 hole at mark Finish hole using 1 2 drill bit Position hardware in hole and secure with screws as shown 2 Measure and mark position on right door as shown x2 1 1 2 3 8 cm PARTS REQUIRED DOOR HARDWARE BEGIN 1 TOP VIEW 1 4 Pre drill and 1 2 Drill through 1 3 4 4 4 cm 39 3 4 101 0 cm ...

Page 48: ... OO in open position with bolt end 3 8 down from frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 Fig B Your spring bolts are now installed Fig A FLOOR Loop contacts base x4 x4 1 2 5 16 drill for bolt 1 deep Loop contacts base PRE DRILL 4 HOLES PRE DRILL 4 HOLES 1 1 4 x 2 1 2 x 69 3 8 with bolt in open position OPEN POS...

Page 49: ... primed side facing out RIGHT LEFT SIDE TRIM PARTS REQUIRED BEGIN 1 Install right side corner trim flush to soffit and flush to front and back wall panels Secure with 2 finishing nails spaced evenly Repeat for left side x26 2 5 1 cm 1 3 4 x 79 9 16 1 3 4 x 68 3 16 2 5 1 cm Finishing Nails Flush to panel Flush to panel Flush to panel Flush to panel Angled end flush up to soffit Angled end flush up ...

Page 50: ...and install between roof panel and back wall purlin Flush foam strip along inner edge of trim Install 6 screws in the panel valley nearest right edge Fig B and then with 12 screws in each of the 3rd and 5th valleys as shown Center screws in framing Predrill all holes BACK OF SHED BACK OF SHED Foam Enclosure Strip Measure from edge of front trim 1 8 BIT 3 mm 26 x 82 1 2 66 x 209 6 cm x1 x1 Foam Str...

Page 51: ...panel peak Fig C Center screws in framing Predrill all holes Secure panel to purlins and framing with 18 2 screws in each of the 1st 3rd and 5th panel valleys Fig C Center screws in framing Predrill all holes Install roof panel with 3 overlapping countour waves covering the installed panel x24 2 5 1 cm ROOF PANELS PARTS REQUIRED 1 8 BIT 3 mm 26 x 82 1 2 66 x 209 6 cm x1 x1 Foam Strip 26 66 cm Foam...

Page 52: ... purlins and framing with 6 2 screws in panel peak Fig C Center screws in framing Predrill all holes Secure panel to purlins and framing with 18 2 screws in each of the 1st 3rd and 5th panel valleys Fig C Center screws in framing Predrill all holes x24 2 5 1 cm ROOF PANELS PARTS REQUIRED 1 8 BIT 3 mm 26 x 82 1 2 66 x 209 6 cm x1 x1 Foam Strip 26 66 cm Foam Enclosure Strip 2 5 1 cm Screws Flush end...

Page 53: ...to purlins and framing with 6 2 screws in panel peak Fig D Center screws in framing Predrill all holes Secure panel to purlins and framing with 2 2 screws in each of the 1st 3rd 5th and 7th panel valleys Fig D Center screws in framing Predrill all holes x30 2 5 1 cm ROOF PANELS PARTS REQUIRED 1 8 BIT 3 mm 26 x 82 1 2 66 x 209 6 cm x1 x1 Foam Strip 26 66 cm Foam Enclosure Strip 2 5 1 cm Screws Flus...

Page 54: ... roof panel and back wall angled purlin frame Flush foam strip along inner edge of trim Secure panel to purlins and framing with 6 2 screws in panel peak Fig E Center screws in framing Predrill all holes Secure panel to purlins and framing with 30 2 screws in each of the 1st 3rd 5th 7th and 8th panel valleys as shown and as in Fig E Center screws in framing Predrill all holes x36 2 5 1 cm ROOF PAN...

Page 55: ...s filled with black Center screws in framing Predrill all holes ROOF PANELS CAUTION Do not stand or lean on roof panels CAUTION Do not over drive the screws in the peaks snug only Note to installer Please refer to this roof panel screw layout guide ...

Page 56: ...panels and flush to side fascia Secure with 2 screws spaced approximately 8 apart Drive screws through the flashing and into the side trim framing Fig F Don t over drive screws 47 3 4 121 3 cm Rake Flashing 15454 1 1 4 x 95 1 2 3 2 x 242 6 cm x1 x11 2 5 1 cm 8 TYP 20 3 cm Fig F 2 5 1 cm Screw in peak of panel 1 8 BIT 3 mm 2 5 1 cm Screws Flush Flush Flush 47 3 4 121 3 cm ...

Page 57: ...s of roof Overlap flashing at center of front overhang and side flashing Install foam enclosure strips end to end between roof panel and rake flashing Secure flashing with 2 screws in panel peaks spaced approx 8 apart with 2 screws in each overlap Drive screws through the flashing foam strips and into the panel peaks along front of roof Fig H 2 3 4 Foam Enclosure Strips Peel stick to flashing FINI...

Page 58: ... 1 1 2 X 23 14 K 23140108000 1 Side Soffit 3 8 NG 1 1 2 X 73 5 16 K 73050108000 2 Vertical Trim Front 3 8 NG 1 3 4 X 76 9 16 K 76090112000 2 Vertical Trim Front Right 3 8 NG 1 3 4 X 76 9 16 RGT K 76090112100 1 Vertical Trim Front Left 3 8 NG 1 3 4 X 76 9 16 LFT K 76090112200 1 Vertical Trim Back 3 8 NG 1 3 4 X 68 K 68000112000 2 Vertical Trim Back Right 3 8 NG 1 3 4 X 68 3 16 RGT K 68030112100 1 V...

Page 59: ...SB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic lat...

Reviews: