31a.
Locate both Vertical Door Jambs and position
flush against front narrow wall stud. The Jamb is 3”
wide and will sit flush to outside of wall siding. When
positioned correctly, secure Jamb using 4 - 2 1/2”
screws. Complete both sides.
31.
Complete positioning and attachment of front gable as per
Step 30.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 14