45.
With both Rafter Ridge Boards
connected. Completely secure
Gable framing to both outside rafters
with 8 - 2” screws per gable side.
Metal Offsetting
Ridge Board
Connectors
44.
At the peak, align Ridge Boards so
they are flush together and secure them with
16 - 1 1/4” screws.
Important
- if there is a
gap between Ridge Boards, try pushing side
walls closer together from outside. Walls
should be 91” apart at top from inside of wall
plate to wall plate.
To completely secure Ridge Boards, place
4 - 1 1/4” screws into any of the remaining
Metal Ridge Board Connectors holes.
Complete both sides. (2 per side)
43.
Remove temporary Filler Trims required to help support Rafter Sections.
Important-
Do not discard, will need later.
Remove temporary
Filler Trim.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 19