37.
Flip Rafter Section over so Soffit is
facing down.
36.
To fortify the completed Rafter
Section prior to lifting on to roof,
temporarily secure 2 - 75” long Filler
Trim pieces to rafters as shown to the
left with 4 - 1 1/4” screws per pieces.
Important-
Do not discard Filler Trim
Pieces, will need later.
38.
With several helpers, lift
completed Rafter Section up above
the walls.
39.
Carefully slide outside
rafters of Rafter Section up
on gable framing.
Temporarily attach 2 Filler
Trim Pieces to secure Rafter
Section while lifting. (Filler
Trims found in
Step 57.
Soffit
Gable Framing
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17