background image

01OVLPRA0604SDFW-V1

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

6x4 Overlap Reverse Apex Single Door Fixed Window

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) 

Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

01OVLPRA0606SDFW-V1

6x6 Overlap Reverse Apex Single Door Fixed Window

01OVLPRA0806SDFW-V1

8x6 Overlap Reverse Apex Single Door Fixed Window

01OSBRA0806SDFW-V1

8x6 Shiplap Reverse Apex Single Door Fixed Window

01OVLPRA1006SDFW-V1

10x6 Overlap Reverse Apex Single Door Fixed Window

01OSBRA0604SDFW-V1

6x4 Shiplap Reverse Apex Single Door Fixed Window

Refer to the instructions pages for you spoecific product code

Summary of Contents for 01OSBRA0604SDFW-V1

Page 1: ... Ensure that there will be access to all sides for maintenance work and annual treatment Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level we cannot accept responsibility for your safety whilst erecting or using this product Mercia Garden Products Limited Sutton On Trent Newark Nottinghamshire NG23 ...

Page 2: ... 10 Cover Trim 1800mm Qty 4 Ridge Bar 1707mm Qty 1 Door Strip 1590mm Qty 2 Eaves Frame 897mm Qty 4 Fascia 694mm Qty 4 Door Block 140mm Qty 1 Finial x2 T Hinge Qty 2 Felt L Bracket Qty 2 Turn Button Qty 2 Pad Bolt Qty 1 Nail Bag Felt Tacks x 63 20mm Screw x 12 30mm Black Screw x 2 30mm Screw x 68 50mm Screw x 26 40mm Screw x 36 Remove transportation blocks from the bottom of each panel before begin...

Page 3: ...ews as shown in diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides Step 2 2 3 3x50mm Screws Pre drill hole 50mm screw Step 3 9x50mm Screws Fix the corners with 50mm screws as shown in diagram Pre drill hole 50mm screw 1 3 Step 4 8x20mm Screws Place the ridge bar in between the two gables Ensure the top corners of the ridge bar sit flush with the top...

Page 4: ... through the roof sheet at the top Make sure to attach the roofs to the ridge bar 40mm screw Pre drill hole Pre drill hole 12x 30mm Screws 20x 40mm Screws Step 6 b Once the roof is fixed attach the building to the floor with 50 mm screws 14x 50mm Screws 50mm screw Pre drill hole 63x Tacks Felt tacks 18 18 18 Step 7 Cut the felt into two 1894mm long sheets and lay onto roof as shown in diagram ensu...

Page 5: ...light overhang at the top Fit the fascias to the roof over the felt and secure in place with 40mm screws as shown Pre drill to avoid splitting Pre drill hole 40mm screw 11 13 13 11 11 11 14 Step 10 Use 4x30mm screws to fix each beading strip onto the door panel Ensure that the screw is parallel with the door frame when fixing the strip to the door panel as shown in the close up view Line up the do...

Page 6: ...bolt retainer to the door panel framing using 4x30mm screws Fix the turn buttons using 1x30mm black screw per turn button 17 30mm screw 15 30mm screw 2x 30mm Black Screw 10x 30mm Screw It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back ...

Reviews: