background image

          Assembly of Den

 

 

Hammer

 

Step ladder

 

Sand paper

 

Battery-powered drill/screwdriver

 

8mm drill

 

Pencil

 

Tape measure

 

Gloves

 

Sharp knife and saw

         

IMPORTANT! 

PLEASE READ PRIOR TO ASSEMBLY OF 
THE BUILDING 

EVERY PRECAUTION IS TAKEN TO 
ENSURE THAT YOUR BUILDING HAS NO 
ELEMENT INCORRECTLY PLACED OR 
POSSIBLY HAZARDOUS, HOWEVER 
PRIOR TO USE PLEASE CHECK ALL 
SURFACES FOR THE FOLLOWING: 
1 RAISED GRAIN, SPLINTERS: sand 
down timber to smooth finish 
2 NAIL/SCREW/PIN HEADS PROUD: tap 
home to be flush with surface of timber 
3 DAMAGED SCREW HEADS 
RESULTING IN SHARP SPLINTERS OF 
METAL: replace 
4 SHARP ENDS OF NAILS/ SCREWS/ 
PINS PROTRUDING THROUGH THE 
PANEL: remove and reposition. 
5 ENSURE ALL PARTS ARE SECURED 
AGAINST REASONABLE FORCE: 
remove and refit 
6 ENSURE THERE ARE NO LOOSE 
PARTS: remove and refit/discard 

We recommend that protective 
gloves be worn throughout

 

     

PLEASE NOTE

 

19/
12/
07 

   

TOOLS REQUIRED 

QTY    DESCRIPTION 

17      Glazing 175x175mm 
66      Beading 177mm 
4      Door beading 35x35x100 
4      Cover strips 1355mm 
2      Plain fascia 1130mm 
2      Profiled fascia 1130mm 
2      Diamonds 

2      Balustrade railing 
2      Vents 
1      Ring handle 
1      Door catch 
4  

 ‘L’ shaped brackets 

3      False hinges 
36      60mm screws 

16

      25mm screws 

18      25mm black screws 
6     10mm black screws 
28      40mm nails 
64      Panel pins 
120    Felt nails 
1      Felt roll 6mtr x 1mtr 
4      Shutters 
2      Window boxes   

1353

1790

FLO OR PANEL

1353

W INDOW  SIDE PANEL

1120

Q TY  2

1790

FRO NT PANEL

1790

1893

RO OF PANEL  QTY 2

1078

1790

BACK PANEL

1353

Parts List 

EXTERNAL VIEW 
OF PANELS 

Brigstock Road, Wisbech PE13 3JJ 

Wood is a natural product and is therefore 
prone to changes in appearance, including 
some warping, movement and splitting, 
particularly during unusual climatic conditions 
(long hot or wet spells of weather). As a natural 
occurrence this is not covered by a guarantee. 

Adult Assembly Only - do not attempt to modify this building 

Thank you and congratulations on the purchase of your Shire garden building. We 
believe that this product will give you many years of excellent service. This 
is a natural product manufactured to a high standard therefore if you have any 
queries or experience any difficulties then please contact our customer service 
hotline on 

01945 465 295

. Normal office hours: 8.30 am to 5.00 pm Monday to 

Friday.  

Preparation of base 

We recommend that the base onto which your building will stand should be at least 
75mm larger in each direction than the total floor size of the building. 

Actual floor area of the building 

(not incl

.

verandah)

: 1790x1190 (6’x4’) 

1790x1790 base

Total height clearance: 1856mm 
The chosen position in your garden for the siting of the building should be  
excavated to a depth of 75mm to allow a base of sand, on to which paving slabs 
can be evenly laid - 

THEY MUST BE LEVEL AND FIRM.

 

Treatment/care of your Garden Building 

Treat with a suitable decorative wood finish immediately. We recommend that all 
timber pieces be treated again prior to assembly and again within 3 months of  
assembly. We further recommend that all pieces are treated again at least 
annually or as frequently as the instructions on the product used recommends. 
We would suggest that all wall panels be treated in an upside-down position to 
allow the finish/treatment to ingress into the tongue and groove jointing. 
We would also remind you that you would rarely (if ever) be able to re-treat the 
underside of the floor following assembly. We strongly recommend that the        
underside of the floor is treated an absolute minimum of twice (not including  
pre-treatment). 

Garden buildings are not waterproof, therefore on assembling building we 
recommend using a silicon based sealant between wall panels and between 
wall panels and floor. 

8        20mm screws

Reviews: