P 1

03LBRO1208-V7

12x8 COMBI SUMMERHOUSE V7 

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

Summary of Contents for 12x8 COMBI SUMMERHOUSE V7

Page 1: ...n be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spel...

Page 2: ...26 25 24 23 5x Floor Blocks 28x28x400mm Cover Trim A 12x56x1980mm 2x Cover Trim B 12x56x2000mm Cover Trim C 12x56x2011mm Cover Trim D 12x56x2040mm Cover Trim E 12x56x2070mm 2x Cover Trim F 12x56x2080m...

Page 3: ...ace the small floor No 14 flush against the assembled floor Using 4x50mm screws fix the small floor in place as shown in the diagram 4x50mm Screws Pre drill hole 50mm screw 6 6 16 18 18 16 17 17b 1 6...

Page 4: ...e drill hole 30mm screw 10mm screw 31 31 Step 6 Fix the side of one Back Panel No 5 against the side of the other Back Panel No 2 with 3x50mm screws as shown in diagram Do not secure the building to t...

Page 5: ...s fitted 7x50mm Screws 32 20 8 Step 8 Fix the side of the Internal panel Panel Framing No 8 No 32 against the back of the Back Panel No 5 Allign the panel with Storage Floor as shown and fix externall...

Page 6: ...Boarded Gable Top No 19 in place slotting the groove of the boarding on the gable into the tongue of the Side Panels No 7 as shown with 4x50mm screws 4x50mm Screws 7 5 19 7 Step 12 Fix the side of th...

Page 7: ...g as shown to make sure the building is square Fix with 6x70mm screws per gable top as shown in diagram Make sure to not screw into the doors 6x70mm Screws Pre drill hole 70mm screw 9 10 6 15 15 Step...

Page 8: ...hrough the panel into the floor making sure to screw into the floor bearers External panels not shown Pre drill hole 50mm screw Pre drill hole 50mm screw Step 17c Screw through panel into the alligned...

Page 9: ...ks 1 2 3 Please retain product label and instructions for future reference 35 Step 21 Fix the Facias 4x No 29 and 2x No 30 into position as shown No 29 are for the front and No 30 are for the side Fix...