Step 15
Place the Assembled Storage Door panel
(
No. 6
) against the end of the Sorage
Gable Sides (
No. 9/10
) and fix into postion
internally.
Fix with 3x50mm screws per side as
shown in diagram.
Do not secure the building to the Floor
until the roof is fitted.
6x50mm Screws
Pre drill
hole
50mm
screw
Step 16
Place each Veranda (
No. 15
) flush to the
building as shown to make sure the building
is square.
Fix with 6x70mm screws per gable top as
shown in diagram. Make sure to not screw
into the doors.
6x70mm Screws
Pre drill
hole
70mm
screw
9
10
6
15
15
Step 17a
Place the Roof Panels (
No. 11
) onto the top
of the building. Allign the 2 Roof Panels
so they sit square before fixing into postion.
Do not secure the building to the Floor
until the roof is fitted.
Step 17b
Fix the two Roof panels together using
50mm offset from eachother as shown
in the diagram.
Do not secure the building to the Floor
until the roof is fitted.
8x50mm Screws
Pre drill
hole
50mm
screw
11
11