background image

A

SSEMBLY  INSTRUCTIONS

Silver Line/Green Line

 

6’x8’

255x193x203cm / 100”x76”x80”

Corporate Headquarters

1745 Bonhill Road, Unit # 1

Mississauga, ON L5T 1C1

Canada

Phone: 905-564-6007

Fax: 905-564-0059

E-mail: [email protected]

Footprint Customer Service Department

Toll Free: 1-800-866-5749

Fax: 905-564-0059

E-mail: [email protected]

Distributed by “Footprint Tools Canada Limited”

Footprint Tools Canada Limited

English - 68601

Summary of Contents for Green Line

Page 1: ...ad Unit 1 Mississauga ON L5T 1C1 Canada Phone 905 564 6007 Fax 905 564 0059 E mail sales footprint tools ca Footprint Customer Service Department Toll Free 1 800 866 5749 Fax 905 564 0059 E mail sales...

Page 2: ...ial detergents to clean the clear panels Replacement parts call our service line For additional information please visit our web site www palram com Sort the parts and check against the contents parts...

Page 3: ...40 1 A256 50 79 1290 8 A261 15 75 400 1 A271 23 07 586 1 A282 21 77 553 2 A260 24 85 631 1 P514 17 32x24 09 2 432x614 P515 17 32x24 09 2 432x614 M243 91 7 2330 2 P516 25 79x24 09 1 666x612 P505 9 45x2...

Page 4: ...Qty M285 1847 72 7 1 P304 2 423 M4 SL 2 P333 1 P399 2 441 M6x1 77 M6x45 1 P205 2 M307 4 A306 1 P317 1 spare 22 A323 2 P324 4 411 M6x0 39 M6x10 95 412 M6 100 421 M4x0 63 M4x16 4 422 M4 2 442 0 26 6 5 1...

Page 5: ...the screws Tighten firmly the screws 447 at the lower hole as seen in the lower picture Attach the sides of the base M244 to the front and back base pieces M243 Use the screws and nuts 411 412 as show...

Page 6: ...2 as shown and tighten nut completely Be sure to assemble profiles A111 A112 as shown below with the arrow facing upwards A162 1 A112 2 A111 2 411 Back A112 A111 A112 A111 A162 A162 412 411 412 412 41...

Page 7: ...ghts cups P324 and four plugs Assemble a plug in all four cups P324 Insert each one of them into the gutters A136 ends as shown below NOTE Leave the end cups open on the side you would like the water...

Page 8: ...es A111 A112 one on each end NOTE Assemble the crossbars A256 simultaneously with the gutter A136 using the same screws and nuts The oval holes should be connected to the base of the greenhouse A256 A...

Page 9: ...ack of the greenhouse to profiles A111 A112 using the lower hole of M285 NOTE Assemble the crossbars A256 simultaneously with the M285 using the same screws and nuts The oval holes must be connected t...

Page 10: ...connected at the back to the gutters A136 on its upper holes and to profiles A103 and A104 as shown in drawing c NOTE Assemble profiles A103 and A104 simultaneously to the base using the base inner ho...

Page 11: ...n the back of connector M285 NOTE On the sides you should slide profile A283 onto the existing screws as shown on figure a On the other end slide the screws 411 and then connect it to M285 b Follow st...

Page 12: ...e to be connected at the front to the gutters A136 on its upper holes and to profiles A203 and A204 as shown below NOTE Assemble profiles A203 and A204 simultaneously to the base A113 1 A114 1 A203 1...

Page 13: ...ave loose Assemble the ridge A141 under and to profiles A113 A114 at the front and to profiles A115 A116 at the back Assemble profile A211 from the outside to profiles A113 A114 A211 1 A141 1 A211 A14...

Page 14: ...the corner profiles A111 and A112 at the two ends and simultaneously to profiles A203 and A204 and crossbars A256 b Connect the crossbars A256 to profile A111 A112 in both corners using the A283 lower...

Page 15: ...connected to the base a On the other end slide the head of screw 411 into the groove on profile A102 insert the screw into predrilled holes in the gutter A136 and close DO NOT TIGHTEN with nut 412 b...

Page 16: ...bly procedure to all profiles A102 on the roof NOTE The vent in the roof can be inserted replacing one of the middle panels In order to assemble the vent you have to insert an additional screw 411 int...

Page 17: ...ep Assemble aluminum profiles A222 onto aluminum profiles A211 a Connect aluminum profile A222 b and aluminum profile A261 to profile A113 c Note level profile A222 on the left side with profile A211...

Page 18: ...16 A192 1 A174 1 A173 2 4008 4008 4008 4008 A174 A173 A173 A173 A192 A192 A174...

Page 19: ...A182 in place Make sure panel P518 fits into the groove in profile A182 b Tighten all screws NOTE Make sure the grooves on both sides of the panel are properly positioned along the aluminum extruded p...

Page 20: ...1 and self locking nuts 423 Tighten screw and nuts Note The door wheel should fix without turnning When inserting the rubber R303 apply some lubrication solution on the aluminum A173 if needed 423 421...

Page 21: ...512 c Connect corners with screws 411 and nuts 412 Slide the final profile A271 with the handle until it fits the holes on both profiles A282 and the two holes on the panel P512 d Connect corners with...

Page 22: ...24 Insert noise reduction elements Put one part of P317 in the middle of each section of the wall and the roof as shown in the picture below it will be used later on A141 A260 P317 21 A306 A141 P317 P...

Page 23: ...rly positioned along the aluminum extruded profiles See also next step When inserting the plastic strips you must put pressure on them until they snap into place Put the pressure at one end and contin...

Page 24: ...P514 and P515 P516 are in position Note follow the numerical sequence while assembling the panels P502 see previous step P502 13 P505 1 P514 2 P515 2 P516 1 P308 6 P311 28 P314 2 P315 2 P502 P502 P502...

Page 25: ...on the roof insert the panels by sliding them into the gutter and the plastic holde P317 The plastic holder P317 must be pushed in the groove on the gutter P502 7 P513 1 P305 2 P311 14 P513 P311 P311...

Page 26: ...m with reasonable force 412 411 A222 Insert the door lower track A192 inside the special aluminum rail A162 a simultaneously with the door wheels into the upper track A222 After you assemble the door...

Page 27: ...30 31 Push on the top cover P399 until it clicks PUSH HERE P205 P399 2 P399 P399 P205 2 P205 P205...

Page 28: ...nal level position immediately after completion of the assembly to withstand high winds effects The pegs M307 spikes are assembled from the inside of the greenhouse Make sure to use the pre punched no...

Page 29: ...Unit 1 Mississauga ON L5T 1C1 Canada Phone 905 564 6007 Fax 905 564 0059 E mail sales footprint tools ca Footprint Customer Service Department Toll Free 1 800 866 5749 Fax 905 564 0059 E mail sales fo...

Page 30: ...des pi ces de rechange appelez notre ligne de service Pour des informations suppl mentaires n h sitez pas visiter notre site internet www palram com triez les pi ces et v rifiez qu elles correspondent...

Page 31: ...1 A256 50 79 1290 8 A261 15 75 400 1 A271 23 07 586 1 A282 21 77 553 2 A260 24 85 631 1 P514 17 32x24 09 2 432x614 P515 17 32x24 09 2 432x614 M243 91 7 2330 2 P516 25 79x24 09 1 666x612 P505 9 45x23...

Page 32: ...mm Qt P304 2 423 M4 SL 2 P333 1 P399 2 441 M6x1 77 M6x45 1 P205 2 M307 4 A306 1 P317 1 spare 22 A323 2 P324 4 411 M6x0 39 M6x10 95 412 M6 100 421 M4x0 63 M4x16 4 422 M4 2 442 0 26 6 5 1 445 8x1 5 M8x7...

Page 33: ...Bien visser les vis 447 dans l orifice inf rieur comme dans le diagramme du bas Fixez les c t s de la base M244 aux l ments avant et arri re de la base M243 Utilisez les vis et les crous 411 412 comm...

Page 34: ...e il est indiqu et vissez fond l crou Veillez bien monter les profils A111 A112 comme il est indiqu plus bas avec la fl che vers le haut A162 1 A112 2 A111 2 411 Arri re A112 A111 A112 A111 A162 A162...

Page 35: ...s P324 ainsi que quatre l ments Montez une prise dans chacune des coupes P324 Ins rez chacune l extr mit des goutti res A136 comme indiqu ci dessous NOTE laissez les coupes d extr mit ouvertes sur le...

Page 36: ...111 A112 une chaque extr mit NOTE Assemblez les traverses A256 en m me temps la goutti re A136 en utilisant les m mes vis et crous Les perforations ovales doivent tre situ es la base de la serre A256...

Page 37: ...re de la serre aux profils A111 A112 en utilisant l orifice inf rieur de M285 NOTE Assemblez les traverses A256 en m me temps l l ment M285 en utilisant les m mes vis et crous Les perforations ovales...

Page 38: ...ent tre fix s l arri re des goutti res A136 par ses orifices sup rieurs et aux profils A103 et A104 comme il est indiqu dans le diagramme c NOTE Assemblez les profils A103 et A104 en m me temps la bas...

Page 39: ...l arri re du connecteur M285 NOTE sur les c t s il faut glisser le profil A283 sur les vis existantes comme indiqu sur la figure a A l autre extr mit glissez les vis 411 puis fixez l l ment M285 b Su...

Page 40: ...vent tre fix s l avant des goutti res A136 par les orifices sup rieurs et aux profils A203 et A204 comme sur le diagramme ci apr s NOTE Montez les profils A203 et A204 en m me temps sur la base A113 1...

Page 41: ...t en laissant du jeu Montez l ar te A141 par dessous les profils A113 A114 l avant et aux profils A115 A116 l arri re Montez le profil A211 de l ext rieur aux profils A113 A114 A211 1 A141 1 A211 A141...

Page 42: ...aux profils de coin A111 et A112 aux deux extr mit s et en m me temps aux profils A203 et A204 et aux traverses A256 b Fixez les barres transversales A256 aux profils A111 et A112 aux deux coins en u...

Page 43: ...s 411 la base a De l autre c t glissez la t te de la vis 411 dans la rainure du profil A102 ins rez la vis dans les trous pr par s dans la goutti re A136 et fermez NE PAS SERRER avec un crou 412 b NOT...

Page 44: ...ous les profils A102 au toit NOTE le trappe de ventilation dans le toit peut tre ins r en rempla ant un des panneaux centraux Pour monter le vent il vous faut ins rer une vis suppl mentaire de type 41...

Page 45: ...ors de l tape pr c dente Montez les profils en aluminium A222 dans les profils en aluminium A211 a Fixez le profil en aluminium A222 b et le profil en aluminium A261 au profil A113 c Note bien placer...

Page 46: ...16 A192 1 A174 1 A173 2 4008 4008 4008 4008 A174 A173 A173 A173 A192 A192 A174...

Page 47: ...les rainures des profils A192 et A174 Emboitez le panneau P518 dans la rainure inf rieure a Mettez en place le profil A182 Assurez vous que le panneau P518 s emboite bien dans la rainure du profil A18...

Page 48: ...verrouillant 423 Bien serrer les vis et les crous Note la roue de la porte doit se fixer sans tourner Lorsque vous ins rez le caoutchouc R303 appliquez une lotion lubrifiante sur l l ment en aluminiu...

Page 49: ...anneau P512 c Fixez les coins avec des vis 411 et des crous 412 Glissez le dernier profil A271 avec la poign e jusqu ce qu il s emboite sur les orifices des deux profils A282 et les deux orifices sur...

Page 50: ...l ments de r duction de bruit Mettez une partie du P317 au milieu de chaque section du mur et du toit comme il est indiqu dans le diagramme ci dessous Cela sera utilis plus tard A141 A260 P317 21 A30...

Page 51: ...oir galement la prochaine tape Lorsque vous ins rez les bandes en plastique vous devez imp rativement appuyer sur les bandes jusqu ce qu un bruit sec se fasse entendre indiquant qu elles sont bien en...

Page 52: ...anneaux en polycarbonate P505 P514 et P515 P516 Note suivez la s quence dans l ordre pendant le montage des panneaux P502 voir l tape pr c dente P502 13 P505 1 P514 2 P515 2 P516 1 P308 6 P311 28 P314...

Page 53: ...e toit ins rez les panneaux en les faisant glisser dans la goutti re et l l ment en plastique P317 L l ment en plastique P317 doit tre pouss dans la rainure de la goutti re P502 7 P513 1 P305 2 P311 1...

Page 54: ...r une force raisonnable 412 411 A222 Ins rez le sillon inf rieur de la porte A192 dans le rail sp cial en aluminium A162 a en m me temps que les roues de la porte dans le sillon sup rieur A222 Apr s a...

Page 55: ...30 31 Appuyez sur le couvercle du haut P399 jusqu ce que vous entendiez un click Poussez ici P205 2 P205 P205 P205 P399 2 P399 P399...

Page 56: ...son emplacement final imm diatement apr s avoir achev le montage pour pouvoir supporter des vents puissants Les piquets M307 pointes sont fix s de l int rieur de la serre Veillez utiliser l entaille...

Reviews: