
5
*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.
Assemble the gutters A136
to the profiles (A111 / A112)
one on each end.
NOTE:
Assemble the
crossbars A256
simultaneously with the
gutter A136 using the same
screws and nuts. The oval
holes should be connected
to the base of the
greenhouse.
!
A256
A136 / 2
A256 / 4
A256
A136
411
412
411
412
Inside view
A256
A256
A256
A256
A256
A136
411
412
411
Outside view
411
411
A256