
8
*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.
Assemble profiles A283 on
the back of connector
M285.
NOTE
: On the sides you
should slide profile A283
onto the existing screws as
shown on figure (a).
On the other end slide the
screws 411 and then
connect it to M285 (b).
Follow steps (a) & (b) in
sections 1&3.
A283 / 3
A283
a
b
M285
a
a
(b)
(b)
1
2
3
A283
A283
A283
412
412
412
412
411
411
411
411