background image

16776

USE THIS MANUAL FOR YOUR EXTENDED STATESMAN.

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-800-577-9663

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 6:00 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

STOP!

STOP!

Summary of Contents for ADD ONE 12 x 4

Page 1: ...with assembly or product information call our toll free number 1 800 577 9663 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 6 00 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST STOP STOP ...

Page 2: ... This page intentionally left blank ...

Page 3: ...ur shed are listed on page 12 Inventory all parts listed on pages 5 9 Contact our Customer Service Team if any parts are missing or damaged CLASSIC STATESMAN GABLE 12 x 12 304 8 x 365 8 cm ASSEMBLY MANUAL 16776 06 04 2013 A BACKYARD PRODUCTS COMPANY KEEP THIS MANUAL FOR FUTURE REFERENCE BUILDING SIZE ACTUAL FLOOR SIZE 12 x 12 365 8 x 365 8 cm 12 x 12 365 8 x 365 8 cm BASE MODEL 12 x 16 365 8 x 487...

Page 4: ... lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk Gun Hammer Level BEGIN Pencil Phillips Screwdri...

Page 5: ...4 REINFORCED WOOD FLOOR FRAME OPTIONAL 3 X Z _ 4 J J shown below as shaded Below is a list of additional materials not included x4 x36 q q z q q V q q q q 4 12x16 x5 x30 q q z q q V q q q q 4 12x20 x6 x36 q q z q q V q q q q 4 12x24 X x3 x18 q q z q q V q q q q 4 12x12 X X X ...

Page 6: ... 10 3 3 12x16 12x12 12x16 12x20 12x24 2 coats recommended D G H I J K 60 184 70 245 80 90 306 365 Q x1 I L G JQ BRR K BU VR B x1 I L G JQ BRR K BU VR B x2 I L G JQ BRR K BU VR B x2 I L G JQ BRR K BU VR B ZX 0 X X q q q q x4 q q q q x6 FLOOR PANELS Not Included W XB Y R B J QR V Y R BU H B B Z X X 12x20 12x24 12x12 12x16 q q 1 6 x 121 9 x121 9 cm x1 q q 1 6 x 121 9 x121 9 cm x1 q q 1 6 x 121 9 x121...

Page 7: ...L q q x12 GABLE 12 X 12 PARTS LIST W W I V B B R V Z J V Z V B B x1 q q q q 12x12 x5 q q q q x5 q q q q SP x2 q q q q AS x6 q q q q x1 q q q q AM x2 q q q q x23 q q q q x6 q q q q x4 q q q q TP x2 q q q q TP x2 q q q q q q q q x14 q q q q x2 W q q q q x2 W q q q q x4 q q q q x4 q q 1 x 10 2 x 101 6 cm x2 q q 1 x 10 2 x 46 cm x4 AF q q q q _ JQ x1 OO x2 q q q q Q x2 q q q q x2 q q q q x2 q q q q x1...

Page 8: ... 4 cm GABLE PANELS x2 x1 x1 x2 q q 1 x 59 9 x 121 9 cm q q 1 x 59 9 x 121 9 cm q q q q 121 9 cm q q q q 121 9 cm ROOF PANELS I R z JQ ZBJ x2 x2 x2 x2 q q q 92 7 x 121 9 cm q q q 121 6 x 121 9 cm LOFT PARTS LIST q q q q 121 9 cm q q q q cm q q q q 121 9 cm q q q q cm I R z JQ ZBJ x1 x2 x1 x2 x1 x1 q q q q SP PT TP ...

Page 9: ...m x1 SHELVING PARTS LIST q q 5 1 x 7 6 x 25 4 cm q q 2 5 x 10 2 x 243 9 cm q q 1 x 7 6 x 32 cm q q 2 5 x 10 2 x 243 9 cm q q q q q q q q Shelf panels z JQ ZBJ x14 x2 x14 x2 x2 x2 AC NAIL BOXES Shown Actual Size 12x12 12x12 12x16 12x16 12x20 12x20 12x24 12x24 110 4 6 83 62 23 74 110 5 7 91 88 23 74 110 5 7 110 6 8 99 94 23 74 107 105 23 74 ...

Page 10: ...3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm 12x4 B BqJ B B stamped on some parts Z J Z J B I R QR RS RS q q x4 x2 q q q q SP x4 q q q q x4 q q q q x1 q q q q TP q q q q x4 x2 q q q q I R z JQ ZBJ x2 q q 1 x 121 9 x 213 4 cm x2 x2 q q 1 1 x 92 7 x 121 6 cm q q 1 1 x 121 6 x 121 9 cm ...

Page 11: ...U J BU 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm 12x8 B BqJ B B stamped on some parts Z J Z J B I R QR RS RS x2 q q q q q q x8 x8 q q q q x8 q q q q TP q q q q x8 I R z JQ ZBJ x4 q q 1 x 121 9x 213 4 cm x2 x2 q q 1 1 x 121 9 x 243 9 cm q q 1 1 x 92 71 x 243 9 cm ...

Page 12: ...ZE Q V I XB Z J J B J B GABLE 12 x 12 GABLE 12 x 12 GABLE 12 x 12 I ZB Z Z B J B I B B R V BR R B J B L L R O O D R O O D j L L BQ Z X R RR BJ BU GABLE 12 x 16 GABLE 12 x 16 GABLE 12 x 16 I ZB Z Z B J B I B B R V BR R B J B L R O O D GABLE 12 x 20 GABLE 12 x 20 GABLE 12 x 20 I ZB Z Z B J B I B B R V BR R B J B L L R O O D GABLE 12 x 24 I ZB Z Z B J B I B B R V BR R B J B L L_ R O O D ...

Page 13: ...n sill plate and concrete B R Q A C J BU B B BU __ G JQ z _ JQ L L G G JQ L L G G JQ __ G JQ L G G z JQ L L B B H B j L _ L G L G JQ x4 Caulk x1 X X J J J I K z V __ G JQ G _ JQ L G _ z z JQ L G _ z z JQ L _ z z JQ L_ JQ L B B H B j L _ L G L G JQ x2 L _ G L _ z z JQ x2 Caulk x1 A C J BU B B BU __ G JQ L G JQ L L G JQ L L G JQ L_ JQ L L B B H B j L _ L G L G JQ x2 L _ G L _ z z JQ x2 L _ G L L__ J...

Page 14: ... in direct contact with ground B B B X B K JZ J J J q q z q q V q q z q q V x3 x3 x6 x6 q q z q q V q q z q q V V X I J J I RR K I XB Z X Always support frame seams K B ZB Z Z J QQ K L _ Q B V J B L _ ZBJ Asphalt Shingles 12 x 12 12 x 16 12 x 20 12 x 24 x60 x78 x96 x144 Fasteners for Frame to 4 x 4 J X Z X R B B BQ Q J X B DOOR 12 G JQ 12 G JQ Measurements to centers of 4x4 s B Gravel Gravel q 4x4...

Page 15: ...s of 4x4 s 5 BEGIN 2 3 4 1 4 4 J 3 measurement will be approximately L G G z JQ 4 q at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one B X J 4 q runners B R z J 4 J secure at ends with one fastener L G G z JQ L G G z JQ Fig A B 12 G JQ 60 GL _ JQ 60 GL _ JQ 12 G JQ V L G JQ I Q I Y I Q and under seams B J at ends with one fastener ...

Page 16: ... the opposite end of the frame secure the frame to 4x4 runners B X J 4 q runners B R z J 4 5 LEVEL AND SQUARE FLOOR FRAME Fig A Measurements to centers of 4x4 s 240 JQ 240 JQ B J X B _ _ L JZ R B I Q and 4x4 touch V L G JQ I Q I Y I Q and under seams B J at ends with one fastener J J at ends with one fastener 60 GL _ JQ 60 GL _ JQ 12 G JQ 12 G JQ ...

Page 17: ... 4x4 s Lz z z JQ Lz z z JQ B BEGIN 2 3 4 1 4 4 J 3 q Lz z z JQ 4 q fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners B X J 4 q runners B R z J 4 5 LEVEL AND SQUARE FLOOR FRAME J X B _ _ L JZ R B I Q and 4x4 touch B J at ends with one fastener J J with one fastener 60 GL _ JQ 60 GL _ JQ 12 G JQ 12 G JQ ...

Page 18: ...322 z JQ 322 z JQ B BEGIN 2 3 4 1 4 4 J 3 q LL z JQ 4 q fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners B X J 4 q runners B R z J 4 5 LEVEL AND SQUARE FLOOR FRAME J X B _ _ L JZ R B I Q and 4x4 touch B J at ends with one fastener J J with one fastener 60 GL _ JQ 60 GL _ JQ 12 G JQ 12 G JQ ...

Page 19: ...GABLE 12 x 12 GABLE 12 x 16 GABLE 12 x 20 17 IMPORTANT Z Y Z X I J I X J J B BU V Q V R J B Z B R J to avoid over handling of the walls j NOTE L L Z X Z Z Q Z J Z Y I Q B K I B B Y R K BI ...

Page 20: ...6 GABLE 12 x 20 BACK WALL FRAME j x7 x2 x2 R O O D x32 q q q q SP q q q q q q q q TP 61 cm 61 cm 61 cm 121 9 cm 199 4 cm SP TP SP z TP 121 9 cm 1 BEGIN X J Use two B B 2 121 9 cm 2 Nails 4 Nails 4 Nails 2 Nails Fig A Fig A B B j ...

Page 21: ...cm Overlap 2 Nails Place LEFT panel onto wall frame with primed side up as shown V 4 as a gauge block for 4 as a gauge block to mark in the corners B 3 2 Z 0 Move to the opposite end Using the long edge of the panel as a lever move 4 B H Q B B _ L measurement along panel edge 1 BEGIN Flush 30 5 cm Block q 1 9 cm 121 9 cm Primed side UP q q TEMP SPACER ...

Page 22: ...lush 1 9 cm 1 9 cm Flush H Q B B L measurement along panel edge 1 9 cm 1 9 cm R O O D 121 9 cm 121 9 cm Primed side UP Place MIDDLE panel on frame as shown with primed side facing up J Z apart inside panel 4 4 6 5 Repeat STEP 4 to secure RIGHT panel To draw panels tight at seams angle nail q B in groove q q TEMP SPACER ...

Page 23: ... 2 235 cm 44 1 2 113 cm 92 1 2 235 cm 20 1 2 52 1 cm 78 1 2 199 4 cm R O O D G Fig A Fig A B B x4 x4 x10 1 BEGIN 2 X J Use two B B Repeat process to make second wall Proceed to attach wall panels 12 x 12 SIDE WALL FRAMES 3 x48 Nails Nails Nails Nails q q q q q q q q L L_ L L Lz L L_ W W j q q q q ...

Page 24: ...Fig A 1 9 cm 2 Nails L JQ Overlap 1 9 cm L JQ Overlap 2 Nails B q q TEMP SPACER Place a q panel onto wall frame with primed side up as shown V 4 top overhang measurement Use B 3 2 Z inside panel 0 Move to the opposite end Using the long edge of the panel 4 4 4 B H Q B B _ L Q Q R 1 BEGIN 30 5 cm q 0 BLOCK GAA 121 9 cm ...

Page 25: ...frame as shown with primed side facing J Z apart inside panel 4 6 7 J 4 Repeat STEPS 1 5 to assemble your second side wall 15 2 cm 1 9 cm 1 9 cm 30 5 cm 121 9 cm Primed side UP 121 9 cm q To draw panels tight at seams angle nail Flush Flush 4 Proceed to page 33 5 Place next q J Z panel Flush Flush H Q B B L measurement along panel edge ...

Page 26: ... 9 cm 140 1 2 356 9 cm 164 1 2 417 9 cm 185 469 9 cm 92 1 2 235 cm 92 1 2 235 cm 68 1 2 174 cm 44 1 2 113 cm 92 1 2 235 cm 92 1 2 235 cm 20 1 2 52 1 cm 78 1 2 199 cm Nails Nails j x8 q q q q x14 q q q q Repeat process to make second wall frame Proceed to attach wall panels L L Lz L L_ W W z B Fig A ...

Page 27: ...auge block for 4 as a gauge B 3 2 Z inside panel 0 Move to the opposite end Using the long edge of the panel as a 4 4 4 nails B H Q B B _ L Q Q R Block 1 BEGIN GAUGE BLOCK GAA Fig A B 1 9 cm 1 9 cm 2 Nails L JQ Overlap L JQ Overlap 2 Nails Primed side UP 30 5 cm 15 2 cm q 1 9 cm x2 q q 1 x 121 9 x 213 4 cm q q TEMP SPACER 121 9 cm ...

Page 28: ...LS R O O D Place q J Z panel Repeat STEP 4 for remaining panels 4 5 6 4 Proceed to page 33 7 J 4 Repeat STEPS 1 5 to assemble your second side wall x270 q To draw panels tight at seams angle nail Flush Flush Flush B in groove q q TEMP SPACER Primed side UP 30 5 cm 15 2 cm 1 9 cm 1 9 cm 121 9 cm 121 9 cm 121 9 cm ...

Page 29: ...m 96 243 9 cm 44 1 2 113 1 cm 78 1 2 199 cm 116 1 2 295 9 cm 140 1 2 356 9 cm 164 1 2 417 9 cm 188 1 2 478 8 cm 212 1 2 539 8 cm 92 1 2 235 cm 68 1 2 173 9 cm 44 1 2 113 1 cm 20 1 2 52 1 cm Nails Nails x4 q q q q x4 q q q q TP x18 q q q q Repeat process to make second wall frame Proceed to attach wall panels x4 q q q q L L_ Fig A B W W TP TP ...

Page 30: ...e block for 4 as a gauge B 3 2 Z inside panel 0 Move to the opposite end Using the long edge of the panel as a 4 4 4 nails B H Q B B _ L Q Q R Block 1 BEGIN GAUGE BLOCK GAA Fig A B 1 9 cm 1 9 cm 2 Nails L JQ Overlap L JQ Overlap 2 Nails Primed side UP 30 5 cm 15 2 cm q x2 q q 1 x 121 9 x 213 4 cm 1 9 cm q q TEMP SPACER 121 9 cm ...

Page 31: ...remaining panels 4 5 6 4 Proceed to page 33 7 J 4 Repeat STEPS 1 5 to assemble your second side wall x370 q Flush Flush Flush B in groove To draw panels tight at seams angle nail Flush q q TEMP SPACER H Q B B L measurement along panel edge Primed side UP 30 5 cm 15 2 cm 1 9 cm 1 9 cm 121 9 cm 121 9 cm 121 9 cm 121 9 cm ...

Page 32: ...212 1 2 539 8 cm 236 1 2 600 8 cm 260 1 2 661 7 cm 281 713 8 cm 92 1 2 235 cm 96 243 9 cm 92 1 2 235 cm 96 243 9 cm 92 1 2 235 cm 68 1 2 173 9 cm 44 1 2 113 1 cm 92 1 2 235 cm 20 1 2 52 1 cm 78 1 2 199 cm Nails Nails x8 q q q q x4 q q q q TP Repeat process to make second wall frame Proceed to attach wall panels Fig A B W W x22 q q q q TP TP ...

Page 33: ...or 4 as a gauge block B 3 2 Z inside panel 0 Move to the opposite end Using the long edge of the panel as a 4 4 4 nails B H Q B B _ L Q Q R Block 1 BEGIN GAUGE BLOCK GAA Fig A B 1 9 cm 1 9 cm 2 Nails L JQ Overlap L JQ Overlap 2 Nails Primed side UP 30 5 cm 15 2 cm q x2 q q 1 x 121 9 x 213 4 cm 1 9 cm q q TEMP SPACER 121 9 cm ...

Page 34: ... Z panel Repeat STEP 4 for remaining panels 4 5 6 4 Proceed to page 33 7 J 4 Repeat STEPS 1 5 to assemble your second side wall x470 Flush Flush Flush B in groove To draw panels tight at seams angle nail Flush q q q TEMP SPACER Primed side UP 30 5 cm 15 2 cm 1 9 cm 1 9 cm 121 9 cm 121 9 cm 121 9 cm 121 9 cm 121 9 cm ...

Page 35: ...12 GABLE 12 x 16 GABLE 12 x 20 33 j FRONT WALL FRAME Door Header x1 R O O D x10 x5 q q q q q q q q AM AM 61 cm 61 cm 22 9 cm 24 1 cm 24 1 cm 170 2cm X J Z 2 1 BEGIN j Nails Proceed to assembling front wall frame 3 ...

Page 36: ...x1 R O O D x24 X J Use two B 2 1 BEGIN j x2 q q q q x1 q q q q SP q q q q TP x6 q q q q Fig A DIMENSIONS ARE TO CENTER OF STUDS MAINTAIN DIMENSION BETWEEN STUDS TP 101 6 cm 101 6 cm 162 6 cm 95 9 cm 269 9 cm 121 9 cm 170 2 cm 199 4 cm 61 cm Nails SP 95 9 cm 61 cm W ...

Page 37: ...ABLE 12 x 16 GABLE 12 x 20 35 j FRONT WALL FRAME R O O D x28 Use two connection B B 3 DIMENSIONS ARE TO CENTER OF STUDS MAINTAIN DIMENSION BETWEEN STUDS 24 1 cm 170 2 cm 24 1 cm 22 9 cm 170 2 cm j Nails Nails Fig A B ...

Page 38: ...GABLE 12 x 12 GABLE 12 x 16 GABLE 12 x 20 36 j FRONT WALL FRAME R O O D x24 4 6 X J 5 4 j MAINTAIN DIMENSION BETWEEN STUDS x2 q q q q 162 6 cm 172 7 cm Nails ...

Page 39: ... R O O D x51 15 2 cm 162 6 cm 1 9 cm 1 9 cm 1 9 cm Primed side UP Flush x1 Place the LEFT panel onto wall frame as shown with primed side up Use 3 2 Proceed to attaching your other front panel 1 BEGIN 4 in groove BLOCK GAA TEMP SPACER measurement along panel edge ...

Page 40: ...62 6 cm 1 9 cm 1 9 cm Place the RIGHT panel onto wall frame as shown with primed side up Use as a gauge block 3 2 Proceed to attaching your wing panels 1 BEGIN 4 Flush Flush Flush Primed side UP BLOCK GAA TEMP SPACER measurement along panel edge To draw panels tight at seams angle nail ...

Page 41: ... until wall is installed 1 9 cm Primed side UP Primed side UP Flush Flush TP FRONT WALL WING PANELS x2 Attach tempoary support TP 2 3 x1 1 BEGIN 4 Proceed to page 40 x72 Temporary Support TP x2 measurement along panel edge 162 6 cm To draw panels tight at seams angle nail ...

Page 42: ...BLE 12 x 16 GABLE 12 x 20 40 BACK WALL INSTALLATION 3 Angle to nail into J Z Fig A 15 2 cm Nail CENTER ON FLOOR NOTE 12 x 12 Model Shown R O O D OO x12 x2 x27 j Use OO J 2 BEGIN 1 Q J J B 3 Z J 4 Z 4 5 4 0 B in groove ...

Page 43: ...ll 2 Be sure the measurement between the sidewall panel edge and the backwall panel is the same along the entire length Then secure with one B Nail along the sidewall panel edge Nail along bottom of sidewall panel J B J It is important to secure the sidewall in the following order 3 15 2 cm 15 2 cm B Nail Panel Same Measurement B Nail DOOR DOOR Fig C J back Nail the lower sidewall corner to B 1 CE...

Page 44: ...ire length corner B Nail along the sidewall panel edge into B B R R J J Z B Z B of the frontwall Q K R QR V J 3 J Z J J J frame B Nail the lower sidewall corner to the B 1 J It is important to secure the frontwall in the following order CENTER B Nail Fig E 15 2 cm 15 2 cm 15 2 cm Nail Screw x8 x4 x26 j BEGIN Nail Fig A B Nail R O O D Panel Same Measurement Fig C Nail 162 6 cm ...

Page 45: ...d mark from end of boards Secure from bottom using four B 4 4 Fig A Secure from top using two 4 B x2 x2 q q q q q q q q TP x2 x2 q q q q q q q q SP Ensure all doubler seams are not aligned over seams of wall top plates TP TP SP SP 121 9 cm 235 cm 235 cm 121 9 cm Z TYP R O O D B 113 cm 113 cm Nails L __ L L _G L L_ _ Screws ...

Page 46: ...from end of boards Secure from bottom using four B 4 4 Fig A Secure from top using two 4 B x2 x2 q q q q q q q q TP x4 x2 q q q q q q q q SP Ensure all doubler seams are not aligned over seams of wall top plates TP TP SP SP SP SP 121 9 cm 121 9 cm 235 cm 235 cm 121 9 cm 121 9 cm Screws Nail 24 61cm TYP B 113 cm 113 cm Nails L L _G L L_ _ ...

Page 47: ...re and mark from end of boards Secure from bottom using four B 4 4 Fig A Secure from top using two 4 B x2 x4 q q q q q q q q TP x2 q q q q x2 q q q q SP Ensure all doubler seams are not aligned over seams of wall top plates TP TP TP TP SP SP 121 9 cm 235 cm 235 cm 121 9 cm Screws Nail 24 61cm TYP B 113 cm 113 cm Nails L L_ _ ...

Page 48: ...oards Secure from bottom using four B 4 4 Fig A Secure from top using two 4 B x2 x4 q q q q q q q q TP x2 q q q q Ensure all doubler seams are not aligned over seams of wall top plates TP TP TP TP SP SP SP SP 121 9 cm 121 9 cm 235 cm 235 cm 121 9 cm 121 9 cm Screws Nail 24 61cm TYP B 113 cm 113 cm Nails R O O D x4 q q q q SP ...

Page 49: ...mbly and repeat STEPS 2 4 to attach second gusset to other side W 4 GUSSET x2 1 4 gap 0 6 cm Center Glue Glue Contact at peak Flush 6 4 your rafters R O O D RAFTERS j q q x192 x18 x16 12x16 x144 x14 x12 12x12 x240 x22 x20 12x20 x288 x26 x24 12x24 Repeat STEPS 1 4 to build additional assembles Remove OO 5 x1 q q q q Temporary support Contact at peak Fit base of rafters in corners of back wall Temp ...

Page 50: ... j 12 x 12 RAFTER INSTALLATION 24 3 8 61 9 cm 24 3 8 61 9 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm DIMENSIONS ARE TO CENTER OF RAFTERS DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS x5 x2 L Preassembled Preassembled x28 Align over studs Maintain the measurements between rafters B Fig A I XB Z facing inward I XB Z facing inward L _ L L G L L_ G ...

Page 51: ... TO CENTER OF RAFTERS DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS x36 L Preassembled x7 Preassembled x2 Maintain the measurements between rafters Align over studs B Locate rafters directly over the wall studs B Check you have the measurements shown 1 4 Proceed to page 52 BEGIN 2 3 R O O D Fig A I XB Z facing inward I XB Z facing inward L L G L L_ G ...

Page 52: ...MENSIONS ARE TO CENTER OF RAFTERS DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS x44 x9 x2 L Preassembled Preassembled Maintain the measurements between rafters Align over studs B R O O D Fig A I XB Z facing inward I XB Z facing inward L L_ G Locate rafters directly over the wall studs B Check you have the measurements shown 1 4 Proceed to page 52 BEGIN 2 3 ...

Page 53: ...m DIMENSIONS ARE TO CENTER OF RAFTERS DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS x52 x11 x2 L Preassembled Preassembled Maintain the measurements between rafters Align over studs B Fig A I XB Z facing inward I XB Z facing inward R O O D Locate rafters directly over the wall studs B Check you have the measurements shown 1 4 Proceed to page 52 BEGIN 2 3 ...

Page 54: ...2 x1 x1 AF AF 6 4 cm 6 4 cm Z 5 1 cm 15 2 cm 15 2 cm x4 q q q q AF Flush Mark Flush Flush Mark Flush Flush Flush Flush 2 3 Place center gable panel on AF primed side up as shown Mark bottom of center gable panel at center on primed side Place left panel on AF J 1 BEGIN x24 4 Repeat STEP 3 for right panel 5 Repeat STEP 1 4 for front gable panels ...

Page 55: ...x 20 53 R O O D GABLE INSTALLATION W W Flush Flush Pre assembled 15 2 cm 6 7 Repeat STEP 6 for front gable Center gable assembly on back wall and overlap back wall Z 4 j x110 15 2 cm Flush Flush Screws Screws Nails Nails 15 2 cm 15 2 cm x8 ...

Page 56: ...Z 5 1 cm Attach panel to end of rafter with rough 1 3 cm from edge of trim B and J B Move to the opposite end Using the long edge of the panel as a lever move the panel side to side J the peak B measurement to the rafter B measurement Secure panel with BEGIN 1 2 until securely fastened must use the panel s long edge as a lever to bring your roof L G L L G L L_ ...

Page 57: ... between the center of each rafter at the lower edge of the panel and secure with one B Move to the top of the panel and keep spacing between the center nail into each rafter B Z inside panel J measurement at the rafter B Z inside panel 3 4 Repeat process to attach roof panels on the opposite side Proceed to page 62 Z Fig E 24 61 cm 24 3 4 62 9 cm 24 61 cm 24 61 cm 24 61 cm 24 3 4 62 9 cm NOTE Mea...

Page 58: ... roof Flush at peak Flush at peak B Fig C R O O D Z 5 1 cm Z 5 1 cm L L G q q q q x2 GAUGE BLOCK GAA Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner J B corners Attach panel with the rough side up measurement on the rafter B and the J B the corners 1 9 cm L L_ Fig A ...

Page 59: ... measurement at the rafter B Z inside panel Attach the two L lower J at the rafter B Z panel Attach the two 48 x 48 J to the upper panel and roof peak B rafter B Z 3 5 6 4 Repeat process to attach roof panels on the opposite side Proceed to Page 62 x4 B Flush at peak Fig F x282 121 6 cm 92 7 cm q q 1 1 x 121 6 x 121 9 cm x4 q q 1 1 x 92 7 x 121 9 cm x2 q q q q apart Z 5 1 cm 24 61 cm 24 3 4 62 9 c...

Page 60: ... roof B R O O D Flush at peak Z 5 1 cm Z 5 1 cm q q q q x2 GAUGE BLOCK GAA Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner J B corners Attach panel with the rough side up measurement on the rafter B and the J B the corners L L_ Flush at peak Fig C 1 9 cm Fig A ...

Page 61: ...nels with the the rafter B Z Attach the L _ lower roof J the rafter B Z inside panel Attach the _z z 48 and 48 x 96 J rafter B Z 3 5 6 4 Repeat process to attach roof panels on the opposite side Proceed to Page 62 x2 B Flush at peak Fig F x318 Rafter Roof Panel Gable Panel 121 6 cm 92 7 cm q q X 1 1 x 121 6 x 121 9 cm OSB x2 x4 q q X 1 1 x 92 7 x 121 9 cm OSB q q X q q X x2 q q X q q X apart Z 5 1...

Page 62: ... B Flush at peak Z 5 1 cm Z 5 1 cm q q q q x2 GAUGE BLOCK GAA Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner J B corners Attach panel with the rough side up 1 9 cm measurement on the rafter B J peak B the corners R O O D Flush at peak Fig C 1 9 cm Fig A ...

Page 63: ... center of the rafters each rafter B Z inside panel Attach the L lower J B to the upper panels with the the rafter B Z Attach the L _ lower roof J the rafter B Z inside panel Attach the 2 _z z 48 and 48 x 96 J rafter B Z 3 5 6 4 Repeat process to attach roof panels on the opposite side Proceed to Page 62 x4 B Flush at peak Fig F x358 Rafter Roof Panel Gable Panel 121 6 cm 92 7 cm q q X 1 1 x 121 6...

Page 64: ... q q q q q q x2 W R O O D GABLE TRIM x2 W Z 5 1 cm x32 Fig A W W 4 Install front gable trim W and W J J B as shown 2 BEGIN 1 Repeat above steps to secure the back wall gable trim 3 4 Flush Flush to top of panel NOTE 12 x 12 Model Shown Flush Roof Panel ...

Page 65: ... EAVE TRIM 48 x2 q q q q x2 q q q q AS L _ L L G L L_ x8 R O O D approximately Flush Fig A AS AS x60 125 7 cm 243 9 cm 3 2 cm 3 7 6 cm Screw 2 3 Orient AS J roof panel B 5 BEGIN 4 4 Orient between AS J 1 4 4 4 q Secure and AS Screw ...

Page 66: ...Orient J J B 6 BEGIN 4 4 Orient AS between and J step 2 to attach AS 1 R O O D Screw Flush Fig A AS AS 125 7 cm 243 9 cm 12 cm x2 q q q q x2 q q q q AS x88 x2 q q q q Orient J J roof panel Repeat step 2 to attach 3 approximately 5 4 4 q Secure and Screw x8 ...

Page 67: ...ient J J B 6 BEGIN 4 4 Orient between AS and J step 2 to attach 1 R O O D Fig A AS AS 125 7 cm 243 9 cm 243 9 cm x4 q q q q x2 q q q q AS x92 Orient AS J J roof panel Repeat step 2 to attach AS 3 Screw Flush approximately 5 4 4 q Secure and AS Screw x8 ...

Page 68: ... 4 4 4 4 q Orient and between AS and J Repeat step 2 to attach and Secure and AS 1 AS AS 125 7 cm 243 9 cm 121 9 cm 243 9 cm x4 q q q q x2 q q q q AS x103 x2 q q q q Orient AS J J step 2 to attach AS 3 Screw Fig A Flush approximately R O O D Screw x8 ...

Page 69: ...E 12 x 20 67 j CORNER TRIM x64 4 B 4 BEGIN Proceed to installing your collar ties J Repeat on other side 1 212 1 cm 207 cm 2 3 R O O D x4 x4 Fig A NOTE 12 x 12 Model Shown q q q q q q q q J Caulk seam before painting trim Corner Trim ...

Page 70: ...12 x 12 COLLAR TIE HINT For best appearance install collar tie on back side of rafter x6 48 L L L z L L_ z Flush Nails TP Locate collar tie TP on back of center rafter as shown Z 4 J 1 3 4 BEGIN 2 R O O D x1 TP q q q q ...

Page 71: ...16 COLLAR TIES j For best appearance install collar tie on back side of rafter Flush Nails TP Locate collar tie TP on back of 3rd rafter from the door as shown Z 4 J 1 4 4 BEGIN 2 3 R O O D x12 Flush 48 L L z L L_ z x2 TP q q q q ...

Page 72: ... z j 12 x 20 COLLAR TIES j For best appearance install collar tie on back side of rafter Flush Nails TP Locate collar tie TP on back of 3rd rafter from the door as shown Z 4 4 J 1 4 4 BEGIN 2 3 R O O D x18 Flush x3 TP q q q q ...

Page 73: ...4 COLLAR TIES j For best appearance install collar tie on back side of rafter Flush Flush Nails TP Locate collar tie TP on back of 3rd rafter from the door as shown Z 4 J 1 4 4 BEGIN 2 3 x24 x4 TP q q q q R O O D ...

Page 74: ...2 x 20 72 j x2 LOFT JOIST ASSEMBLY Ensure parts TP and SP J glue across SP and TP as shown 4 7 6 cm nails in a staggered pattern 1 BEGIN 2 3 R O O D 4 B 4 4 cm 4 4 cm Glue SP SP TP TP Flush Flush Flush q q q q TP x2 q q q q SP x28 Fig A ...

Page 75: ...BLE 12 x 16 GABLE 12 x 20 73 j LOFT JOIST INSTALLATION Measure mark and locate and PT J q J B 4 J 1 BEGIN 3 2 4 R O O D Nails x2 PT x1 W x1 x1 q q q q q q q q PT x16 q Pre Drill Pre Drill Flush Flush Flush Flush Fig A ...

Page 76: ...BLE 12 x 16 GABLE 12 x 20 74 j Attention J _ K V distributed across loft LOFT PANELS 1 2 4 V BEGIN R O O D Flush 20 cm 20 3 cm Y 4 2 5 1 cm Nails 3 4 board ZX 0 q either side of installed deck panels x1 x1 q q q q x34 ...

Page 77: ...12 x 20 75 j SHELF INSTALLATION Secure AC 1 BEGIN 2 R O O D Flush Flush AC Flush 153 7 cm 113 cm Floor Level Level Corner Stud Right Shelf Bracket x84 x2 x12 Nail Nail q q q q q q q q AC x14 x14 3 Continue shelf installation on page 66 ...

Page 78: ...0 76 j SHELF INSTALLATION Install shelf panels centered over shelf supports nails at each support Secure and 1 3 4 4 BEGIN 2 R O O D 5 1 cm Nails x68 q q X q q X q q X q q X x2 x2 q q q q q q q q x2 x2 Flush Flush 2 5 1 cm Nails Flush 60 6 cm ...

Page 79: ...pports OO Tighten securely HINT V 0 attached to doors R O O D 2 Attach temporary supports Tighten securely 3 x2 OO Make sure spacer is attached Tighten screws securely OFFSET _ z JQ Screws L _ z JQ Screws Q Y Z 1 cm 1 cm 1 cm 1 cm OFFSET x2 OO q q q q q q q q x1 1 9 cm 59 5 cm 59 5 cm 1 9 cm NOTE Screw hole will be used later x4 ...

Page 80: ...he wall support and floor frame Fig B Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Z J B B Y Z R J X B I QB Y B Center doors on panel seam as shown B 5 J 6 Remove temporary supports and check doors open properly J q 7 9 4 Attach temporary support OO J B 4 x7 Flush to bottom of wall panels J X B X I QB B OO OO Fig A Screw ...

Page 81: ...lly on the left door in the door opening B X B 1 j q q q q x2 DOOR WEATHERSTRIP OO 5 On right door center OO vertically in door opening B will offset the 3Z B 3 Secure OO 4 B 4 OO Screws 5 1 cm x10 Overhang Screws 5 1 cm 2 5 cm OFFSET Secure OO 4 B 2 Fig A B Fig C Center OO in door opening Approximately R O O D ...

Page 82: ...Locate screws as shown in B Use two screws at seams BEGIN 1 Center trim 4 4 shown 4 2 Level and as shown and secure from inside with eleven 4 5 4 3 B 2 Screws Center Screws Screws Level Flush Flush Screws x7 x1 q q q q q q q q x2 q q q q R O O D Approximately x66 ...

Page 83: ...between door opening 1 j x1 DOORS 3 Secure Threshold 4 2 4 4 door hinges BEGIN Level decorative hinges in position as shown and secure with 1 9 cm screws 1 2 Screws Screws Flush 64 Metal Threshold Special coating Bagged separately x11 x4 Bagged separately 1 9 cm x12 R O O D ...

Page 84: ...4 J Bolt is open when loop is contacting base B BEGIN 1 HINT With door closed extend bolt and tap with hammer to leave a mark in wood for drilling R O O D 4 5 Mark and pre drill holes for screws Mark and pre drill holes for screws Fig A R J J base q q _ XB Z B R position _ Spring is loose G B I j 1 deep OO x4 R J J base L G B I bolt 1 deep B q q OO x4 Spring is loose x8 ...

Page 85: ...BLE 12 x 20 j DOOR HARDWARE R O O D 2 3 BEGIN 1 4 Drill Bits x1 x2 4 Q Position hardware in hole and secure with screws as shown Measure and mark position on right door as shown L QQ Set Screw q 1 3 cm 3 0 Y30 INSTALL ON RIGHT DOOR ...

Page 86: ... 20 j FRONT GABLE WINDOW BEGIN 2 q 4 1 R O O D x1 q 30 5 x 30 5 cm x2 q q q q x2 q q q q x14 L L 3 4 5 4 x8 Flush K Center Center Screws 1 9 cm Screws 5 1 cm Nails 12 30 5 cm Outside view NOTE paintable exterior caulk before installing trim ...

Page 87: ... V manufacturer and these instructions VENT BEGIN Locate and mark for two vents in side walls as shown One at top and one at bottom Cut out marked openings 4 J 1 4 vents 3 2 q q j x2 x12 15 2 cm 7 6 12 7 cm 35 6 cm 1 3 cm 1 3 cm 35 6 cm 15 2 cm 12 7 cm Caulk Caulk ...

Page 88: ...ections provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED 3 J 4 OK to overlap at ridge XY0 V Flush Flush 3 4 under roof felt on eave side Fig A 4 X 0 J trim Drip edge Drip edge Roof felt Fig A NOTE 12 x 12 Model Shown ...

Page 89: ... row must be straight and level all the way across with lower edge of roof deck ZX 0 3 4 J BEGIN 1 Shingle overlaps roof decking 4 past roof deck 4 J with drip edge 4 Nails QB B BU V I XB Z ZB SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing Strip 1 2 5 cm 1 2 1 3 cm Full Rain Slot Half A Rain Slot Notch Notch ...

Page 90: ...continued J 2 2 Notch or BR Notch I J 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 3 J z 0 4 J stagger each row 3 2 5 cm 2 5 cm Flush with rain slots Flush with rain slots Notch Notch ...

Page 91: ...shingles overlap at ridge cut to peak with a utility knife 5 3 12 7 cm or less 12 7 cm MAX Top of rain slot Cut Off 4 9 Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge X Using your shingle hooked blade carefully cut shingles along chalk line 6 7 ...

Page 92: ...ngled cut 3 J 3 2 3 BEGIN 1 5 1 cm 5 1 cm 5 1 cm 5 1 cm 5 1 cm 5 1 cm Top of slot Z Flush B R B Z Z X Z B R B Z Z X Z 12 7 cm FRONT OF SHED Flush 12x12 12x20 12x16 12x24 Z z q z z q z z q z 57 60 cut pieces for 12 x 12 model 28 to 30 Pieces 48 to 50 Pieces 38 to 40 Pieces 57 to 60 Pieces ...

Page 93: ...12 x 12 GABLE 12 x 16 GABLE 12 x 20 91 SHINGLES RIDGE CAP continued Continue installing ridge cap to back of roof 4 3 J 4 5 6 7 L B R B 4 Cut at top of rain slot Flush to shingles BQ J R II Y Z ZB Cap 10 2 cm ...

Page 94: ...nt and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exteri...

Reviews: