I N S T A L L A T I O N
73 / 192
XS20000_31_manual_ger_eng_it_V1.1.2.doc
R. Kistler
3.
Installation
3.1
Inspecting the shipment
Keep the shipping cartons and the packaging material for the ship-
ping company or the sales agency. If parts of the system were dam-
aged during transport, please submit a transport damage claim
to your supplier within 24 hours. Should you discover damage after
accepting the equipment, please claim this as hidden damage.
3.2
Unpacking the UPS system
CAUTION
If the UPS system is unpackaged at low ambient tempera-
tures, condensation may form on the outside and inside of
the housing. Install the UPS system only when the inside and
outside are completely dry (risk of an electric shock)
The UPS system is heavy (see
Technical Data
). At least two
persons are required for lifting out of the packaging and for
the installation
NOTE
Move and open the packaged UPS system carefully. Leave
the components in the packaging until these are installed.
To unpack the housing and the accessories:
1. Transport the packaged UPS system to the installation site using
a hand lift truck or forklift (see Figure 2 left).
2. Remove the outer carton (see Figure 2 right).
Summary of Contents for 10000 3/1 XANTO S Series
Page 2: ...2 192 XS10000 XS20000_31_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Page 64: ...64 192 XS10000 XS20000_31_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Page 66: ...66 192 XS10000 XS20000_31_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Page 128: ...128 192 XS10000 XS20000_31_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Page 130: ...130 192 XS10000 XS20000_31_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Page 192: ...192 192 XS10000 XS20000_31_manual_ger_eng_it_V1 1 2 doc R Kistler ...