7
.
EtherCAT Connection Procedure
29
9
A confirmation dialog box on the
right is displayed. Confirm that
there is no problem and click the
Yes
Button.
A screen stating "Synchronizing"
is displayed.
A confirmation dialog box on the
right is displayed. Confirm that
there is no problem and click the
No
Button.
*Do not return to RUN mode.
10
Confirm that the synchronized
data is displayed with the color
specified by "Synchronized"
and a message is displayed
stating "The synchronization
process successfully finished.".
If there is no problem, click the
Close
Button.
*A message stating "The
synchronization process
successfully finished" is
displayed if the Sysmac Studio
project data coincides with the
Controller data.
*If the synchronization fails,
check the wiring and repeat
from step 1.
Summary of Contents for SCON-CA
Page 40: ...2015 0115 1213 P585 E1 02 ...