7
.
EtherCAT Connection Procedure
28
4
A confirmation dialog box on the
right is displayed. Confirm that
there is no problem and click the
Yes
Button.
5
Check that "0 Errors" and "0
Warnings" are displayed in the
Build Tab Page.
6
Select
Online
from the
Controller Menu.
A yellow bar is displayed on the
top of the Edit Pane.
7
Select
Synchronization
from
the Controller Menu.
8
The Synchronization Dialog Box
is displayed.
Confirm that the data to transfer
(NJ501 in the right dialog box) is
selected. Then, click the
Transfer To Controller
Button.
*After executing the Transfer To
Controller, the Sysmac Studio
data is transferred to the
Controller and the data is
compared.
Summary of Contents for SCON-CA
Page 40: ...2015 0115 1213 P585 E1 02 ...