
30
Enterprise Manager 2100 User’s Guide
14413-200 Rev. A
3.4 Sliding Rail Kit for Rack Mounting
Figure 3-4. Attach the Rail to the Appliance Chassis (Right Assembly Shown).
1. Align the end of the sliding rail with the notch in the chassis pull brackets [1].
2. Attach the rail with four 6 mm M4 screws [2]. Torque each screw to 2 ft-lb (3 N∙m).
3. Repeat Step 1 and Step 2 for the second sliding rail.
Attach the Adjustable Brackets to the Track
Attach the larger, adjustable L-shaped brackets to the telescoping track as follows:
Figure 3-5. Attach the Large L-Brackets to the Track (Right Assembly Shown).
Summary of Contents for Enterprise Manager 2100
Page 1: ...I631 E 01 Enterprise Manager 2100 User s Guide...
Page 36: ......
Page 60: ......
Page 82: ......