
Chapter 3: Installation
Determine the Sliding Rail Kit Installation Location and Method
Determine the installation location as follows:
1. Decide the height position (U location) where you want to install the appliance.
2. Use masking tape (or similar) to mark the installation location on all four rack posts.
Remove the Sliding Rail from the Track
Remove the sliding rail from the telescoping track as follows:
Figure 3-3. Remove the Rail From the Track (Right Assembly Shown).
1. Pull the end of the sliding rail [1] until it is fully extended from the track [2] engaging
the locking button [3].
2. Press the locking button [3] and continue to pull the sliding rail [1] removing it com-
pletely from the track.
3. Repeat Step 1 and Step 2 for the second rail assembly.
Attach the Sliding Rail to the Chassis
Attach the sliding rail to the appliance chassis as follows:
14413-200 Rev. A
Enterprise Manager 2100 User’s Guide
29
Summary of Contents for Enterprise Manager 2100
Page 1: ...I631 E 01 Enterprise Manager 2100 User s Guide...
Page 36: ......
Page 60: ......
Page 82: ......