14
Installation
Section 2-1
Mounting to DIN Rail
• Mount the EJ1G to DIN Rail.
• Use screws to secure the DIN Rail in at least 3 locations.
• Install the DIN Rail vertically to the ground.
Installation Method
Pull down the hooks on the bottoms of the Units, and then catch the hooks on
the tops of the Units onto the DIN Rail and press the Units onto the DIN Rail
until they lock into place.
Removal Method
Pull down on the hooks with a flat-blade screwdriver and lift up on the Units.
DIN Rail: PFP-50N (50 cm) or PFP-100N (100 cm)
Vertical: OK
Horizontal: NG
4. Make sure the Units are
locked into place.
2. Catch the upper hooks onto the DIN Rail.
3. Press in on the Units.
1. Pull down the hooks.
0.
4
2.
5
Flat-blade screwdriver
Flat-blade screwdriver
(unit: mm)
Summary of Contents for EJ1G
Page 3: ...iv ...
Page 17: ...xviii ...
Page 21: ...xxii ...
Page 53: ...32 Unit Configuration Examples Section 2 4 ...
Page 69: ...48 Changing SPs During Operation Section 3 3 ...
Page 81: ...60 Other Functions Section 4 5 ...
Page 145: ...124 Other HFU Functions Section 5 7 ...
Page 167: ...146 Detailed Description of Services Section 6 4 ...
Page 229: ...208 Parameters That Can Be Allocated for Programless Communications Appendix ...
Page 237: ......