
1-2-1
1-2 Installation
1-2-1 Installation environment
1. Temperature: 50 to 90.5°F (10 to 32.5 °C)
2. Humidity: 15 to 80%RH
3. Usable power source: 1
220-240V AC, 6.3A
4. Frequency fluctuation: 50Hz+/-2% or 60Hz+/-2%
5. Installation location
Avoid the place exposed direct sunlight and the strong lightning. Don't expose the photoreceptor to the
direct sunlight and the strong lightning in case of the paper jam.
Avoid the locations where high temperature and humidity, low temperature and humidity and the sur-
rounding temperature of the machine rapidly change or the locations where cool wind and hot wind
expose directly.
Avoid the locations with dust and much vibration.
When setting on the stand, use the stand which can sufficiently endure in the machine weight.
Set the horizontal location. (Horizontal degree: Left and right front and rear are 5mm or less, Twisting is
3mm or less.)
Avoid the locations where the substances which can be transformed the machine and the photoreceptor
(the gas and the chlorine-based organic solvents that the vapor which the mercury, acid and alkali are, the
inorganic gas, NOx and SOx ) are drifting.
Select the good ventilated location.
6. Set the space which needed for the operation and the maintenance of the machine as following.
Figure 1-2-1 Setting dimensions
500 mm or more
100 mm or more
100 mm or more
450 mm or more
1000 mm or more
Y11
8
240-1
Service Manual
Summary of Contents for d-Copia 3002MF plus
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 67: ...1 2 40 This page is intentionally left blank Y118240 1 Service Manual...
Page 484: ...2 2 8 This page is intentionally left blank Y118240 1 Service Manual...
Page 548: ...Installation Guide DP 7100 Document processor Installation Guide...
Page 549: ...DP 7100...
Page 553: ...2 1mm 0mm A D C B B A...
Page 554: ...3 E A...
Page 555: ...4 I M3x8 F G M4x10 K J H A...
Page 556: ...5 ON A...
Page 558: ...7 D E B...
Page 559: ...8 F G M4x10 H I M3x8 K J B...
Page 560: ...9 B...
Page 570: ...19 8 6 7 10 11 9 A B...
Page 580: ...DP 7110 Document processor Installation Guide...
Page 584: ...2 2 2 C M4x14 E 2 A...
Page 585: ...3 F G H M3x8 BLACK A...
Page 586: ...4 I A...
Page 587: ...5 J L K M3x8 K M3x8 K M3x8 A...
Page 588: ...6 O N A...
Page 589: ...7 ON A...
Page 591: ...9 2 2 2 C M4x14 E B...
Page 592: ...10 F G H M3x8 BLACK B...
Page 593: ...11 I B...
Page 594: ...12 J L P K M3x8 K M3x8 B...
Page 595: ...13 O N B...
Page 615: ...DP 7120 Document processor Installation Guide...
Page 619: ...2 1mm 0mm B B A D C A...
Page 620: ...3 E A...
Page 621: ...4 G F F H ON 10 mm 10 mm A...
Page 623: ...6 D B...
Page 624: ...7 E B...
Page 625: ...8 F ON G F H 10 mm 10 mm B...
Page 634: ...17 2 6 7 3 4 5 A B...
Page 636: ...19 9 11 10 13 14 12 10 mm A B...
Page 646: ...PF 791 500 x 2 Paper feeder Installation Guide...
Page 654: ...PF 810 3000 sheet deck Installation Guide...
Page 667: ...DF 791 3000 sheet finisher Installation Guide...
Page 682: ...DF 7120 1000 sheet finisher Installation Guide...
Page 686: ...2 7 7 15 a b a a b b b a A...
Page 687: ...3 A...
Page 688: ...4 c d 14 c d c d 12 c d c d 14 c d c d 12 c d A...
Page 689: ...5 D ON A...
Page 691: ...7 L B...
Page 693: ...9 G B...
Page 694: ...10 b a 17 17 25 a b a a b b B...
Page 695: ...11 c d 24 c d c d 22 c d B...
Page 696: ...12 B...
Page 697: ...13 ON D B...
Page 700: ...AK 740 Bridge unit Installation Guide...
Page 702: ...MT 730 Mailbox Installation Guide...
Page 717: ...PH 7A C D Punch unit Installation Guide...
Page 738: ...DT 730 B Document tray Installation Guide...
Page 740: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8...
Page 741: ...FAX System 12 Installation Guide...